Skip to main content

Ring road project for Vietnam’s Ho Chi Minh City

The project to construct the ring road around Vietnam’s Ho Chi Minh City is now gathering pace. The project to construct three separate sections of the Ring Road No2 is expected to cost US$660.35 million, according to an estimate by the HCMC Department of Transport. The first section of the ring road runs from Binh Chanh District's Nguyen Van Linh Parkway to National Highway 1's An Lac Intersection. The second section of the new ring road runs between the Binh Thai Intersection in District 9
October 12, 2017 Read time: 1 min

The project to construct the ring road around Vietnam’s Ho Chi Minh City is now gathering pace. The project to construct three separate sections of the Ring Road No2 is expected to cost US$660.35 million, according to an estimate by the HCMC Department of Transport. The first section of the ring road runs from Binh Chanh District's Nguyen Van Linh Parkway to National Highway 1's An Lac Intersection. The second section of the new ring road runs between the Binh Thai Intersection in District 9' and Phu Huu Bridge. A feasibility study on this stretch of the project is being completed. The third section of the ring road runs between Thu Duc District's Go Dua and Binh Thai Intersection.

Related Content

  • US$410mn ADB loan to build second Vietnam Southern Highway
    August 14, 2013
    The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
  • Vietnam’s road development programme
    August 17, 2018
    Vietnam is pushing ahead with its road and highway development programme. One crucial project is for the construction of the Ho Chi Minh (HCM) Road project. When complete the route will connect Cao Bang with Ca Mau, with some US$903 million required to finish the work. Around 79% of the 2,744km HCM route is open already, with the road due for completion by 2020. The 98km stretch linking Cam Lo and La Son should be ready in 2019, although work has stopped for the moment on another 289km section of the route
  • Vietnam’s North-South Expressway project prioritised
    October 20, 2017
    Vietnam’s Ministry of Transport is prioritising the construction of the North-South expressway project. It is seeking the approval of the Vietnamese Government approval to speed up the development of a 713km stretch of the expressway. This particular section of the expressway is phase one of the project and has an estimated construction cost of US$ 5.73 billion. Just over half of the construction cost will be paid for by private investors while Government bonds are expected to pay for the remaining sum. Thi
  • New Vietnam airport link roads
    May 26, 2023
    New Vietnam airport link roads will be built to a key Vietnam airport.