Skip to main content

Norway’s long tunnel looks set to beat records

Norway looks set to retain its position as a leader in tunnelling with the project moving forward to build a new link connecting the city of Stavanger with Bokn. This 27km road tunnel is being designed to carry four lanes of traffic, which would make it the world’s longest underwater road tunnel. It will also be the world’s longest four lane tunnel as well as the world’s deepest road tunnel, dropping around 385-390m below sea level. The Rogaland Fixed Link will form part of the E39 route, connecting Kristia
September 19, 2016 Read time: 2 mins
Norway looks set to retain its position as a leader in tunnelling with the project moving forward to build a new link connecting the city of Stavanger with Bokn. This 27km road tunnel is being designed to carry four lanes of traffic, which would make it the world’s longest underwater road tunnel. It will also be the world’s longest four lane tunnel as well as the world’s deepest road tunnel, dropping around 385-390m below sea level. The Rogaland Fixed Link will form part of the E39 route, connecting Kristiansand, Stavanger, Haugesund and Bergen in the south of Norway.

Also known as the Rogfast, the tunnel runs from Harestad in Randaberg to Arsvågen in Bokn. In addition to the main tunnel there will additional 4km link to the island of Kvitsøy. Once the tunnel is open, it will shorten the journey time between Stavanger and Norway’s second city, Bergen.

The project forms part of a plan by the Norwegian Government to improve road links in the country and to construct bridges and tunnels so that drivers no longer have to use ferries or take long detours. The project is being planned by Norconsult and the tunnel is expected to cost in the region of €1.5-€1.6 billion to build, with tolls paying back a chunk of the construction costs. The link is expected to open to traffic in 2025 or 2026.

Related Content

  • Norway mega-project contract for Fugro
    December 20, 2017
    The largest road project in Norway’s history has seen Fugro win a second major contract from the Norwegian Public Roads Administration (NPRA). The work on the E39 Coastal Highway is for the construction of a 1,100km route from Kristiansand in the south to Trondheim in central Norway. This project is expected cost around €34.4 billion (NOK 340 billion).
  • Norway’s fire-damaged Skatestraum tunnel to remain closed until 2016
    August 20, 2015
    Repair costs for the fire-ravaged undersea Skatestraum tunnel in Bremanger have risen to nearly US$4.7 million, according to Norwegian media reports. Repairs will run into next year when the tunnel, on Norway’s southern North Sea coast, will re-open, although no date was given, the Norwegian media outlet E24 said. The tunnel, nearly 2km long, was opened only in 2002 at a cost of nearly $39 million. No one was injured in the accident when the tunnel was severely damaged by fire on July 15. A tanker
  • Plans are being prepared for Norway’s deepest tunnel link
    April 13, 2012
    The Danish consultant Cowi is working on a study for Norway’s Rogfast Tunnel, which will be the world's longest and deepest tunnel. The 25km tunnel is planned to open to traffic in 2021. It will cost some €1.08 billion to construct. Cowi has landed contracts for preliminary studies but is also keen to take on a portion of detailed planning.
  • Norwegian road contract awarded
    April 21, 2023
    An important Norwegian road contract has been awarded.