Skip to main content

New study suggests Fehmarn Belt payback close to 50 years

A study by Danish consultant Hans Schjær-Jacobsen has shown that the payback period for the proposed Fehmarn Belt Fixed Link tunnel project between Denmark and Germany will be close to 50 years. This is a decade longer than estimated by the developers of the project which focusses on a 17km immersed tunnel, the study noted. The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The 17km tunnel, including two railway tunnels, two motorway tunnels and an
October 9, 2015 Read time: 2 mins
A study by Danish consultant Hans Schjær-Jacobsen has shown that the payback period for the proposed Fehmarn Belt Fixed Link tunnel project between Denmark and Germany will be close to 50 years.

This is a decade longer than estimated by the developers of the project which focusses on a 17km immersed tunnel, the study noted.

The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The 17km tunnel, including two railway tunnels, two motorway tunnels and an emergency tunnel, will cross the Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Also, driver fees alone are unlikely to be sufficient for the financing of the link. Danish taxpayers will likely have to contribute to the project. More research is needed to pinpoint the finer details of the project whose estimated cost has been rising over the past year.

The Fehmarn Belt immersed tunnel project was approved by the Danish parliament in April 2015. It is supposed to be built, owned - apart from the German land works - and operated by a Danish state agency called Femern, a subsidiary of Sund & Bælt Holding, and financed by loans guaranteed by the Danish government.

The loans are scheduled to be amortised by income from users of the tunnel which is planned to be open at the beginning of 2022. But the project continues to face obstacles, not least obtainable large enough subsidies from the European Union, total construction costs and approval by German authorities.

Government authorities in the German state of Schleswig-Holstein recently indicated that permission for the project, will probably be given in 2017, and not in 201, as previously believed. German authorities have received about 3,100 objections to the project that has risen in cost to around €8.6 billion.

The completion of the project might therefore be delayed from 2021 to 2027.

World Highways reported in February that the Danish government was talking to contractors over the latest rise, a jump of €1.2 billion, in cost estimates for entire project. Contractors estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly by €900 million.

Related Content

  • Study highlights weather effects on traffic
    July 9, 2012
    Extreme weather conditions cost the EU’s transport system at least €15 billion/year. This is the result of a study carried out by the Finnish VTT Technical Research Centre. The study reveals that the greatest costs incurred are from road accidents, with the associated material and psychological effects. Costs arising from accidents are expected to decrease in volume, although time-related costs attributable to delays are projected to increase. In part, this last effect is due to climate change, which has an
  • Sourcing road financing for East Africa’s network expansion
    December 4, 2015
    East Africa’s ambitious road expansion programme is seeing the network expand significantly – Shem Oirere writes The East Africa countries of Kenya, Tanzania, Uganda and Rwanda have announced ambitious road sector expansion plans in the 2015/16 financial year. This is despite their national budgets being weighed down by huge deficits and persisting lack of capacity to spend resources allocated to the sector in previous years. With the huge budget deficits, the countries will have to look for alternati
  • Companies line up for Norway’s Rogfast project at Kvitsøy
    November 27, 2018
    Five companies have expressed an interest in the technically challenging €315 million Kvitsøy section of Norway’s major road and tunnel project Rogfast.
  • NCC picks up Eysturoy and Sandoy tunnel contracts in the Faroes
    November 15, 2016
    Swedish construction company NCC has signed a contract to build two sub-sea road tunnels in the Faroe Islands, an archipelago north of Scotland. The first project – the Eysturoy Tunnel between Eysturoy and Streymoy - will cost around €152 million. The value of second one – the Sandoy Tunnel between Streymoy and Sandoy – will cost about €120 million, but there is an option for the government-owned client, P/F Eystur- och Sandoyartunlar (EST), not to proceed. The government created the company, Eystur – og