Skip to main content

New financing securing Costa Rica road building

A series of loans from the Inter-American Development Bank (IADB) will help finance transportation projects in Costa Rica. Totaling around US$1 billion, the loans will allow a substantial package of works to get underway. This will be of major importance to Costa Rica as it will unlock several key road and transport projects so far held back by the availability of suitable funding. However, the Costa Rican authorities have yet to announce all the road projects intended for construction. So far only three hi
September 21, 2015 Read time: 2 mins
A series of loans from the Inter-American Development Bank (IADB) will help finance transportation projects in Costa Rica. Totaling around US$1 billion, the loans will allow a substantial package of works to get underway. This will be of major importance to Costa Rica as it will unlock several key road and transport projects so far held back by the availability of suitable funding. However, the Costa Rican authorities have yet to announce all the road projects intended for construction. So far only three highway projects have commenced. Some $300 million has been targeted at building the Canas-Liberia road, the Paso Ancho level crossing, the Pozuelo-Jardines del Recuerdo section of road and the northern part of the San Carlos road. And only the Canas-Liberia road and the Paso Ancho crossing are under construction at present. The Costa Rica Government has yet to decide on how the remaining loans should be allotted for transportation works. The loans will help boost the country’s economy by improving transport and there is some hope within the construction sector that the project schedules will be announced shortly.

In a separate development, the IADB has handed over a loan of $60 million to improve local road networks, or Red Vial Cantonal, and this project at least is underway.

Related Content

  • New Costa Rica route in focus
    March 1, 2019
    A new road project in Costa Rica is being evaluated at present. The plans call for an upgrade of Route 32, providing an improved 46km link between Virilla River and Sucio River areas. The project would require the driving a new tunnel in parallel with the existing Zurqui Tunnel, located on the southern side of the Braulio Carillo National Park. The project is expected to cost US$643 million and the route is likely to be offered to tender under a 30 year tolled concession package. A full feasibility study ha
  • Increased infrastructure spending
    February 22, 2012
    With economies booming in the BRIC countries and other regions, spending on infrastructure is at a high - Patrick Smith reports As economic crisis grips much of the world, many countries are still spending billions on infrastructure to improve transportation. While the USA and Europe struggle with debt problems (and this has affected much of the rest of the world) the development of highways, airport, ports and other infrastructure is gathering pace in other regions to boost economic developments.
  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans
  • Costa Rica highway concession package cancelled
    March 19, 2014
    The Costa Rican Government is paying compensation worth US$28.4 million for the cancellation of a highway concession package. The compensation relates to the San José-San Ramón highway concession and is being paid to the Brazilian construction company OAS, reports Business News Americas. This follows a legal dispute over the project and is some $10 million less than OAS originally claimed in compensation. The 30 year concession package was cancelled last year due to opposition. There were allegations of a c