Skip to main content

Key Russian road construction complete

Construction work on the Central Section of Russia’s Western High-Speed Diameter (WHSD) in St Petersburg is complete, with some small detail work now being finished off. The WHSD connects the Southern, Central and Northern sections of St Petersburg and will open to traffic at the end of December. VTB Capital was a key participant in funding the construction of the Central Section and is a major shareholder in the consortium that will operate the entire WHSD route.
December 5, 2016 Read time: 3 mins
Construction work on the Central Section of Russia’s Western High-Speed Diameter (WHSD) in St Petersburg is complete, with some small detail work now being finished off. The WHSD connects the Southern, Central and Northern sections of St Petersburg and will open to traffic at the end of December. VTB Capital was a key participant in funding the construction of the Central Section and is a major shareholder in the consortium that will operate the entire WHSD route.

Vladimir Putin, the president of Russian Federation, took part in the opening ceremony. It was also attended by president and chairman of the management board of VTB Bank Andrey Kostin; plenipotentiary envoy to the Northwestern Federal District Nikolay Tsukanov; the governor of Saint Petersburg Georgy Poltavchenko; deputy minister of Transport of Russia Nikolai Asaul, and head of the Russian Federal Road Transport Agency Roman Starovoit.

The construction of the Central Part of the WHSD and the operation of the highway falls under the Northern Capital Highway private-public partnership. Northern Capital Highway is a consortium consisting of VTB Capital as the majority shareholder, alongside OJSC Gazprombank and others. Investment into the project totalled more than RUB 120 billion.

The WHSD will cut congestion and journey times for drivers in the city. It will relieve the existing highways of the city by managing the traffic through diversion of freight transportation from the seaport of St Petersburg directly to federal highways. It creates an easy two-way access between Pulkovo airport and the business centre of the city.

Andrey Kostin, president and chairman of the Management Board of VTB Group said, “The WHSD is one of the largest and most technologically advanced PPP toll-road projects in Russia and the world. The highway will achieve major infrastructure goals for St Petersburg and will be a key part of the federal transport system.”

“The Western High-Speed Diameter” is the first inter-city toll highway in Russia. The highway is 46km long and consists of three parts connecting the Northern, Central and Southern parts of St Petersburg. The opening of the Central Part of WHSD spanning over 12km will make an entire highway operational.

Northern Capital Highway, an infrastructure consortium including VTB Capital and OJSC Gazprombank is implementing a private-public partnership with the city of Saint-Petersburg. According to the agreement, the company is exercising the functions of financing and construction of the Central Part of the Western High-Speed Diameter. A signed loan agreement with a syndicate of banks including VTB Capital, Gazprombank, the State Corporation Bank for Development and Foreign Economic Affairs (Vnesheconombank), the European Bank for Reconstruction and Development (EBRD) and the Eurasian Development Bank (EDB). Northern Capital Highway has received the operating rights for the entire WHSD.

Related Content

  • Major road plans are being set for Russia’s two key cities
    May 14, 2012
    Targets are being set for road investment, construction and repairs in Russia. To meet the country’s infrastructure needs, Russia’s National Association of Builders estimates that some 1,500km of roads must be built/year. Meanwhile the highway authorities in Moscow are aiming to repair around 33% of the city’s road surface every year. Some 23.6 million m2 of road surface will be repaired in Moscow during 2012, compared with 24.7 million m2 in 2011.
  • St Petersburg road works planned
    December 20, 2021
    New road works are being planned for St Petersburg in Russia.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31
  • More Russian firms sanctioned over Kerch Strait Bridge work
    August 6, 2018
    The European Union has sanctioned more Russian companies involved in the construction of the Kerch Strait Bridge linking Russia with the Crimean Peninsula. Newly placed on the list – now 44 companies in all – are the three firms PJSC Mostotrest, SGM and Stroygazmontazh Most OOO controlled by billionaire Arkady Rotenberg, a close friend of Russian president Vladimir Putin. Others are construction firm CJSC VAD, engineering firm GPSM and the Zaliv Shipyard. Russia seized the Crimea region from the Ukrai