Skip to main content

Key road projects in Venezuela have stalled

A series of key road projects in Venezuela have fallen victim to the country’s overall financial paralysis, a result of its plummeting economy and its disastrous political climate. Insufficient finances have seen work to construct the La Verota-Kempis, Circunvalacion Sur-Caracas and Caracas-La Guaira highways now being stalled for two years.
September 15, 2017 Read time: 2 mins

A series of key road projects in Venezuela have fallen victim to the country’s overall financial paralysis, a result of its plummeting economy and its disastrous political climate. Insufficient finances have seen work to construct the La Verota-Kempis, Circunvalacion Sur-Caracas and Caracas-La Guaira highways now being stalled for two years. Although these projects were deemed priorities to develop transport in the capital Caracas and the immediate area around the city, Venezuela’s financial crisis has resulted in the delays. Although the Ministry of Transport hopes to be able to restart construction, it is not clear where the necessary financing will be sourced from. Construction work has only been carried out on a 4.4km section of the 36km La Verota-Kempis highway that will connect Barlovento to Los Valles del Tuy so far. Some earthmoving work has been carried out for the the 32km Circunvalacion Sur-Caracas highway that will connect La Rinconada with Caricuao. The construction of this section of highway will be complex as it will feature 13 tunnel sections as well as eight viaducts. Although Portuguese contractor Teixeira Duarte won the tender to build a 7km link between Cota Mil and Caracas-La Guaira, work is also stalled on the project.

Related Content

  • Czech bridge facing demolition over condition concerns
    October 29, 2018
    A bridge located in Prague, capital of the Czech Republic, is facing calls for its demolition. Concern has been expressed over the condition of the Hlavka Bridge, which spans the Vltava River. The bridge carries heavy vehicle traffic as well as trams and is one of the city’s major transport arteries. It was built originally from 1909 to 1912, replacing an earlier wooden structure. It was then rebuilt so as to cope with vehicle traffic and at present carries up to 100,000 vehicles/day, making it one of the b
  • El Sillar – Bolivia’s challenging road project
    February 6, 2020
    Construction of Bolivia’s El Sillar highway, the country’s most complicated road project – Mauro Nogarin reports
  • Golden opportunities in the MINT - Mexico, Indonesia, Nigeria, Turkey
    May 21, 2015
    Mexico, Indonesia, Nigeria, Turkey – Global Report offers up some food for thought about where smart money might be headed within the next several years – David Arminas writes China’s rate of growth may be slowing down, but other South East Asian companies are being quick to offer alternate investment opportunities, notably Indonesia. Nigeria, too, has had issues with security of investment. But there are signs that the government may be getting serious at last about tightening up rules and regulation
  • Colombian road projects being planned
    March 5, 2021
    A series of major Colombian road projects is being planned.