Skip to main content

Key Colombian highway deals awarded

Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The n
June 5, 2015 Read time: 2 mins
Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The new highway will directly benefit some 810,000 people living in Sabanalarga, Villavicencio, Yopal (Casanare), Cumaral, Paratebuento (Cundinamarca), Tauramena, Restrepo, Aguazul, Barranca de Upia (Meta), Monterrey and Villanueva. The route should take four years to build and is expected to generate 9,400 direct jobs during its construction. The work will help improve the existing Marginal del Llano arterial road connecting Meta with Casanare by providing additional lanes, as well as new junction at Cumaral. The project also involves the construction of 32 new bridges and 39 pedestrian walkways, in addition to widening 87 existing bridges, the construction of six underpass intersections and the development of three above-ground intersections.

Related Content

  • Transpordiamet opens Tartu procurement
    May 20, 2021
    The Estonian Transport Administration - Transpordiamet - is tendering for the Tallinn–Tartu–Võru–Luhamaa highway section of the planned Western Tartu Bypass.
  • Costa Rica road improvement works
    June 23, 2021
    Costa Rica is planning a series of road improvement works.
  • Czech highway deal for consortium partners
    February 5, 2019
    A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take 44 months to complete. The consortium is headed by Austrian contractor STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ. This new four-lane link will feature two interchanges. The D35 is part of the northern
  • Atkins sells stake in London’s M25 ring road
    December 14, 2016
    Infrastructure engineering firm WS Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million). Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins. In October, the Edge Orbital consortium picked up Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska so