Skip to main content

Key Colombian highway deals awarded

Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The n
June 5, 2015 Read time: 2 mins
Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The new highway will directly benefit some 810,000 people living in Sabanalarga, Villavicencio, Yopal (Casanare), Cumaral, Paratebuento (Cundinamarca), Tauramena, Restrepo, Aguazul, Barranca de Upia (Meta), Monterrey and Villanueva. The route should take four years to build and is expected to generate 9,400 direct jobs during its construction. The work will help improve the existing Marginal del Llano arterial road connecting Meta with Casanare by providing additional lanes, as well as new junction at Cumaral. The project also involves the construction of 32 new bridges and 39 pedestrian walkways, in addition to widening 87 existing bridges, the construction of six underpass intersections and the development of three above-ground intersections.

Related Content

  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • Canada: National Bank and Axium refinance Sea-to-Sky Highway
    July 19, 2016
    National Bank Financial and Axium Infrastructure have refinanced the Sea-to-Sky Highway Improvement Project in the Canadian province of British Columbia. A statement from Axium said that the US$427 million 25-year public-private-partnership had “strong investor support and an A2 rating from Moody’s”. The Sea-to-Sky Highway Investment Limited Partnership - Axium Infrastructure, Régime de Rentes du Mouvement Desjardins and Nova Scotia Pension Agency - is the consortium in charge of the concession. In
  • Hungary: three firms win Sajo valley work
    June 16, 2021
    HE-DO Építo, Soltút Útépíto, Fenntartó és Kereskedelmi and STRABAG Építoipari will improve Hungary’s Sajo River valley secondary roads.
  • Brazilian road deal awarded
    April 26, 2022
    An important Brazilian road package has been awarded.