Skip to main content

Key Colombian highway deals awarded

Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The n
June 5, 2015 Read time: 2 mins
Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The new highway will directly benefit some 810,000 people living in Sabanalarga, Villavicencio, Yopal (Casanare), Cumaral, Paratebuento (Cundinamarca), Tauramena, Restrepo, Aguazul, Barranca de Upia (Meta), Monterrey and Villanueva. The route should take four years to build and is expected to generate 9,400 direct jobs during its construction. The work will help improve the existing Marginal del Llano arterial road connecting Meta with Casanare by providing additional lanes, as well as new junction at Cumaral. The project also involves the construction of 32 new bridges and 39 pedestrian walkways, in addition to widening 87 existing bridges, the construction of six underpass intersections and the development of three above-ground intersections.

Related Content

  • Belgian road link planned
    January 6, 2021
    An important Belgian road link is being planned.
  • Colombian road improvement works
    October 20, 2022
    Colombian road improvement works are being carried out.
  • Delay for tender for link roads to Istanbul’s new Bosporus bridge
    June 25, 2015
    The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motor
  • SMEC wins India State Highway deal
    August 31, 2012
    SMEC is now working on construction supervision and contract administration for the Karnataka State Highway Improvement Project (stage Two) in India. The project is located in Karnataka State and the contract was awarded to SMEC earlier by the local authorities.