Skip to main content

Key Colombian highway deals awarded

Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The n
June 5, 2015 Read time: 2 mins
Colombia’s Villavicencio-Yopal highway will be built by the consortium Estructura Plural Arauca (Conecol-Episol). The package of works was awarded by Colombia's National Infrastructure Agency (ANI). This deal forms part of the group of tenders for the second tranche of Colombia’s 4G roads programme. All nine of the 4G roads projects will be awarded by 15th July 2015. Under the Villavicencio-Yopal highway concession, the consortium must develop 261km of the route with an investment of US$741.9 million. The new highway will directly benefit some 810,000 people living in Sabanalarga, Villavicencio, Yopal (Casanare), Cumaral, Paratebuento (Cundinamarca), Tauramena, Restrepo, Aguazul, Barranca de Upia (Meta), Monterrey and Villanueva. The route should take four years to build and is expected to generate 9,400 direct jobs during its construction. The work will help improve the existing Marginal del Llano arterial road connecting Meta with Casanare by providing additional lanes, as well as new junction at Cumaral. The project also involves the construction of 32 new bridges and 39 pedestrian walkways, in addition to widening 87 existing bridges, the construction of six underpass intersections and the development of three above-ground intersections.

Related Content

  • Serbia’s Corridor 11 highway concession
    October 8, 2013
    In Serbia plans are moving forward for the Corridor 11 highway. The contract for the 48km of highway looks set to be carried out under a concession model by Chinese companies. The deal will also involve the 103km Obrenovac-Preljina highway. The cost of the Corridor 11 highway project has not yet been disclosed. A decision has yet to be made regarding the Horgos-Belgrade-Pozega highway. Part of this route was to be built under a concession awarded to Alpine and Porr and this deal included work on some 250km
  • Go-ahead for controversial highway
    May 30, 2012
    APPROVAL HAS now been given for work to go ahead on a key section of Slovakia’s D1 highway. The work had been delayed as the European Commission (EC) was concerned over environmental issues facing sections of the route that passed through a nature reserve. The EC has now given its approval for construction of the highway between Martin and Presov on conditional terms. The EC says that the sections in zones belonging to the Natura 2000 network can be built once terms are agreed with the Slovak government o
  • Cuenca pushes ahead with 50km ring road
    September 2, 2015
    The Ecuadorian city of Cuenca, a UNESCO World Heritage Site, is in discussions with contractors for construction of a 50km ring road. The city – whose full name is Santa Ana de los cuatro ríos de Cuenca - is the capital of the highland Azuay province and around 2,500m above sea level. It has a population of around 400,000 rising to 700,000 in the larger metro area. Ecuadorian media reports put the cost of the road at around US$600 million. The initiative will be financed by the private sector and the winn
  • Vinci among Comol5 members for the Netherlands’ Rijnland Route
    January 31, 2017
    The Dutch province of South Holland has awarded the contract for building the Rijnland Route to the consortium Comol5, according to consortium member Vinci. Rijnland Route will connect Katwijk, via the A44, to the A4 at Leiden. Comol5 consists of TBI companies Mobilis and Croonwolter&dros (25% each), DIMCO - DEME Infra Marine Contractors - (25%) and Vinci Construction Grands Projets (25%). Value of the contract is €492 million. The consortium will be responsible for the reconstruction of the Leiden