Skip to main content

Ivory Coast bridge deal for French firms

The reconstruction work for an important bridge link in Côte d'Ivoire’s capital, Abidjan, will be carried out by two French contractors. Eiffage and Spie Batignolles are to rebuild Abidjan’s Félix Houphouët-Boigny Bridge. Funding for the work is being provided by the French Development Agency (AFD). The project has a contract value of US$62.73 million and the work is expected to take 30 months to complete.
December 1, 2017 Read time: 1 min
The reconstruction work for an important bridge link in Côte d'Ivoire’s capital, Abidjan, will be carried out by two French contractors. 5871 Eiffage and 3630 Spie Batignolles are to rebuild Abidjan’s Félix Houphouët-Boigny Bridge. Funding for the work is being provided by the French Development Agency (2825 AFD). The project has a contract value of US$62.73 million and the work is expected to take 30 months to complete.

For more information on companies in this article

Related Content

  • French highway concession package awarded
    April 6, 2020
    An important French highway concession package has been awarded.
  • Saudi Arabian money for Tajikistan’s Dushanbe-Kulyab-Khorog-Murgab highway
    January 18, 2016
    Saudi Arabia will provide US$108 million through the Islamic Development Bank for reconstruction of two sections of the Dushanbe-Kulyab-Khorog-Murgab highway in Tajikistan. The sections are the Kulyab-Shuroabad and Shkev-Kalai Khumb, according to the Avesta news agency. The deal was announced after a meeting between Saudi ministry of finance officials and Tajik president Emomali Rahmon in the Saudi capital Riyadh in early January. Rahmon’s visit is considered a success for Tajik’s infrastructure in
  • Bulgaria signs Shipka Pass deal
    June 17, 2022
    The PSVT consortium picked up the Shipka Pass Tunnel project as part of the bypass for Gabrovo City, a town of around 50,000 situated on the Yantra River.
  • Serbia reduces cost of highway construction
    March 22, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget.