Skip to main content

Ivory Coast bridge deal for French firms

The reconstruction work for an important bridge link in Côte d'Ivoire’s capital, Abidjan, will be carried out by two French contractors. Eiffage and Spie Batignolles are to rebuild Abidjan’s Félix Houphouët-Boigny Bridge. Funding for the work is being provided by the French Development Agency (AFD). The project has a contract value of US$62.73 million and the work is expected to take 30 months to complete.
December 1, 2017 Read time: 1 min
The reconstruction work for an important bridge link in Côte d'Ivoire’s capital, Abidjan, will be carried out by two French contractors. 5871 Eiffage and 3630 Spie Batignolles are to rebuild Abidjan’s Félix Houphouët-Boigny Bridge. Funding for the work is being provided by the French Development Agency (2825 AFD). The project has a contract value of US$62.73 million and the work is expected to take 30 months to complete.

For more information on companies in this article

Related Content

  • Tenders soon to replace Beaumont Bridge
    May 4, 2021
    The Waka Kotahi, NZ Transport Agency, said construction over the Clutha River is expected to take two years and cost around US$14.5 million.
  • Jakarta Airport taxiway upgrade
    June 7, 2019
    Equipment from German firm Bauer has been used to help upgrade facilities at Jakarta Airport in Indonesia. The Soekarno-Hatta International Airport is located in Cengkareng, Banten, a suburb of the Indonesia’s capital city, Jakarta, is one of the largest airports in Asia. Handling around 63 million passengers in 2017 and over 447,000 flight movements/year, the aircraft handling facilities were becoming too crowded. The answer was to construct a new connecting taxiway linking the existing runways at the eas
  • Budget set for Zimbabwe highway deal
    November 12, 2018
    The budget has been set at US$693 million for the Zimbabwe’s highway running between Harare, Masvingo and Beibridge.
  • Turkmenistan’s new bridge features novel waterproofing
    November 8, 2017
    Turkmenistan’s new bridge is benefiting from a novel sealing system that will optimise working life as well as maximising safety. A novel waterproofing solution is being utilised for the Turkmenabat - Farap Bridge in Turkmenistan. The project is of note as the structure is the longest metal span bridge in Central Asia. The client for the project is the state-owned firm Turkmenavtohowayollary, while the general contractor is Altcom Road Construction and the consultant engineer is Soyuztransproekt. Stirling