Skip to main content

Ivory Coast bridge deal for French firms

The reconstruction work for an important bridge link in Côte d'Ivoire’s capital, Abidjan, will be carried out by two French contractors. Eiffage and Spie Batignolles are to rebuild Abidjan’s Félix Houphouët-Boigny Bridge. Funding for the work is being provided by the French Development Agency (AFD). The project has a contract value of US$62.73 million and the work is expected to take 30 months to complete.
December 1, 2017 Read time: 1 min
The reconstruction work for an important bridge link in Côte d'Ivoire’s capital, Abidjan, will be carried out by two French contractors. 5871 Eiffage and 3630 Spie Batignolles are to rebuild Abidjan’s Félix Houphouët-Boigny Bridge. Funding for the work is being provided by the French Development Agency (2825 AFD). The project has a contract value of US$62.73 million and the work is expected to take 30 months to complete.

For more information on companies in this article

Related Content

  • Work underway on new Vietnam highway
    January 18, 2016
    Work is now underway on the Lo Te-Rach Soi Highway in Vietnam. The new link runs for 53.34km and connects Kien Giang with Can Tho. The first stage of this project is costing in the order of US$298.62 million. Work on the project will take 30 months to complete.
  • JCB’s Hydradig 110W proves revolutionary for French Contractors
    August 10, 2018
    The versatility of JCB’s Hydradig has landed the machine a role in a demolition application in the centre of Coventry city. The JCB Hydradig 110W was purchased by Rugby-based French Contractors, which is carrying out the project on behalf of Jackson Civil Engineering. The unit is assisting in the strengthening and rebuilding of Swanswell Viaduct between junctions one and four on the A4053, Coventry’s ring road. It is maximising an array of attachments including a Powertilt tilting hitch, a full range of
  • Key Chilean connections
    November 27, 2012
    Strong interest is being shown in the construction sector in Chile for the project to build the Chacao Bridge. The tender process is due to open in the first half of 2013 and a large number of contractors, over 30, have already acquired terms and conditions of the works package. The construction project is expected to cost US$740 million. Bidding is expected to close in early 2014 and the winner will be selected and the contract awarded. Work should start in 2015 and the completion date will be in 2019. A
  • Fast-track Biloxi Bay bridge
    July 18, 2012
    Construction of a bridge destroyed in a hurricane was completed early, and with some added aesthetic benefits Hurricane Katrina, one of the deadliest and costliest natural disasters in US history, made landfall on 29 August, 2005, devastating the Gulf Coast. The US 90 Bridge over Biloxi Bay (connecting the communities of Biloxi and Ocean Springs, Mississippi) was one of many major highway and railroad bridges knocked out of service due to extensive storm damage. The eye of the storm passed 96km west of Bilo