Skip to main content

Interest strong in Brazilian bridge tender

Interest is strong in the tender for Brazil’s proposed Rio-Niteroi bridge project. So far three groups have expressed an interest in tendering for the project, EcoRodovias, Arteris, and current contract holder CCR. The tender will commence on March 18th 2015. A number of other groups had shown interest but will duck out due to legal issues relating to the Lava-Jato case that is ongoing at present. Brazil’s national land transport agency ANTT has set a maximum tariff value for the bridge toll at US$1.89 (BRL
February 10, 2015 Read time: 1 min

Interest is strong in the tender for Brazil’s proposed Rio-Niteroi bridge project. So far three groups have expressed an interest in tendering for the project, 2688 EcoRodovias, 7126 Arteris, and current contract holder CCR. The tender will commence on March 18th 2015. A number of other groups had shown interest but will duck out due to legal issues relating to the Lava-Jato case that is ongoing at present. Brazil’s national land transport agency 5354 ANTT has set a maximum tariff value for the bridge toll at US$1.89 (BRL 5.18). The winner of the tender will be the offer with the lowest tariff, with the contract to last 30 years, and investments estimated at $1.85 billion (BRL 5.14 billion).

For more information on companies in this article

Related Content

  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Key Chilean connections
    November 27, 2012
    Strong interest is being shown in the construction sector in Chile for the project to build the Chacao Bridge. The tender process is due to open in the first half of 2013 and a large number of contractors, over 30, have already acquired terms and conditions of the works package. The construction project is expected to cost US$740 million. Bidding is expected to close in early 2014 and the winner will be selected and the contract awarded. Work should start in 2015 and the completion date will be in 2019. A
  • US bridge tender underway
    January 25, 2021
    The tender for a key US bridge upgrade is underway at present.
  • 2-4 year-old construction equipment tops buyer ‘wish list’
    May 11, 2012
    A leading used construction equipment auctioneer firm boss believes equipment aged between 2 and 4 years is now topping buyers’ ‘wish lists’, as 1 to 2-year-old used stocks deplete. Jonnie Keys, General Manager of Euro Auctions, said that with the cost of new equipment currently up by around 20% on prices in June 2009, the used market is still strong. “Euro Auctions has repeatedly seen over 30% of all plant sold leaving the UK and Europe for projects in Australia, South Africa, South America, Central Ameri