Skip to main content

Honduras inter-ocean highway nearing completion

Work is close to completion on a new inter-ocean highway in Honduras. This 392km road runs between the Pacific Ocean and Atlantic Oceans and is at present around 80% complete. Called the Canal Seco, this new road should be finished in the first quarter of 2017. Work still needs to be carried out on a 100km long section featuring four lanes. This portion of the project is costing some US$300 million, with funding being provided by CABEI.
May 22, 2015 Read time: 1 min
Work is close to completion on a new inter-ocean highway in Honduras. This 392km road runs between the Pacific Ocean and Atlantic Oceans and is at present around 80% complete. Called the Canal Seco, this new road should be finished in the first quarter of 2017. Work still needs to be carried out on a 100km long section featuring four lanes. This portion of the project is costing some US$300 million, with funding being provided by CABEI.

Related Content

  • US$988 million Morocco motorway near completion
    July 23, 2024
    Morocco’s US$988 million motorway is nearing completion.
  • New Guatemala-El Salvador bridge link
    December 7, 2021
    A new Guatemala-El Salvador bridge link is planned.
  • Egypt’s road programme is now restarting
    February 20, 2014
    Egypt is developing its road network – local reporting and images by Egypt correspondent Mohammed Elsayed Tantawy. Egypt is now gearing up its road construction activity, with a view to reducing congestion and improving traffic flow. The country’s main highway connecting capital Cairo with the port city of Alexandria has already seen a major widening programme, but other important routes are also now being upgraded and improved. The road development programme started in earnest some years ago but was delaye
  • Highway project in Texas required demolition equipment
    May 1, 2018
    A contractor in Texas has used equipment from Brokk to help out with a tricky highway project. Upgrading work has been carried out on a 6.4km-long stretch of I-35 in San Antonio between Loop 410 NE and Loop 410 S. This stretch of the route was carrying around 185,000 vehicles/day and was suffering increasing levels of congestion at peak periods. Travel times lengthened by 65% during rush hour, while ramps on opposite sides of the interstate caused additional congestion and safety issues. In one section, t