Skip to main content

Honduras inter-ocean highway nearing completion

Work is close to completion on a new inter-ocean highway in Honduras. This 392km road runs between the Pacific Ocean and Atlantic Oceans and is at present around 80% complete. Called the Canal Seco, this new road should be finished in the first quarter of 2017. Work still needs to be carried out on a 100km long section featuring four lanes. This portion of the project is costing some US$300 million, with funding being provided by CABEI.
May 22, 2015 Read time: 1 min
Work is close to completion on a new inter-ocean highway in Honduras. This 392km road runs between the Pacific Ocean and Atlantic Oceans and is at present around 80% complete. Called the Canal Seco, this new road should be finished in the first quarter of 2017. Work still needs to be carried out on a 100km long section featuring four lanes. This portion of the project is costing some US$300 million, with funding being provided by CABEI.

Related Content

  • Zambia road surfacing upgrade
    February 8, 2018
    Work is starting on an upgrade for a 100km stretch of road in Zambia. The route connects Nchelenge and Chiengi districts and will benefit from a new asphalt surface. The project is costing US$77 million and is being carried out by the contractor Sinohydro Zambia. Delays to the work have been caused by heavy rains however. The Zambian Government has paid an initial $3.8 million for the work to be carried out and the project is expected to take two years to complete.
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Major plan for Bolivian highway expansion underway
    July 9, 2014
    Bolivia has a major programme of highway expansion and improvements underway at present in a plan designed to improve the country’s transport links. The programme includes 16 double-lane highways being built, costing some US$1.85 billion in all. The work is being managed by the state-run road administration company ABC. The roads will improve connections to La Paz, Oruro, Santa Cruz and Cochabamba. The road between La Paz and Oruro is 80% finished. The other projects will be finished between 2015 and 2018.
  • Loan for new road in Honduras
    February 2, 2023
    A key loan will pay for a new road in Honduras.