Skip to main content

Funding found for Romanian road

A €305.7 million loan is being provided to Romania through the European Commission. This will be used to to fund the construction of the Cernavoda-Constanta section of the Sun Highway. The loan will not have to be repaid as it will fall under the Cohesion Fund. The Romania retroactively requested the EU to fund the Highway after contracting with the European Investment Bank in 2005 for a loan to cover construction costs.
January 20, 2015 Read time: 1 min
A €305.7 million loan is being provided to Romania through the 2465 European Commission. This will be used to to fund the construction of the Cernavoda-Constanta section of the Sun Highway. The loan will not have to be repaid as it will fall under the Cohesion Fund. The Romania retroactively requested the EU to fund the Highway after contracting with the 1054 European Investment Bank in 2005 for a loan to cover construction costs.

For more information on companies in this article

Related Content

  • Serbia road project, funding secured
    February 19, 2019
    Construction of the 77km-long Merdare-Nis highway in Serbia is to benefit from external financing. A funding package worth €100 million is being supplied by the European Investment Bank (EIB) for the project. The funding will pay for work on a stretch of the route between Plocnik and Nis in southern Serbia. The highway will improve transport connections with neighbouring Kosovo when it is complete. This project forms part of a series of road building operations in the region, with extensive work having been
  • Major Romanian road projects are underway
    January 23, 2023
    Many major Romanian road projects are currently underway.
  • EIB lends €900mn for Poland’s S7 and S8 dual carriageways
    December 14, 2012
    Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
  • Bosnia gets EBRD loan for Corridor 5c work
    January 8, 2024
    The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.