Skip to main content

Delay for tender for link roads to Istanbul’s new Bosporus bridge

The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motor
June 25, 2015 Read time: 3 mins
Istanbul’s traffic jams are notorious and the city suffers the second worst congestion of any in the world
The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motorway on the 30th June. The tenders are now being postponed to the 31st August and the 7th September respectively.

Construction of the bridge is, however, proceeding well. The structure is a landmark, both in terms of its engineering and architectural importance, due to its size and geographic location. The bridge will carry a heavy structural load comprising both traffic lanes and rail lines, while it is also being designed to cope with the seismic activity that occurs in the area.

The new bridge link is of enormous importance for Turkey, as Istanbul is the country’s commercial centre and its geographic location means it is also a vital through route for traffic between Asia and Europe. Traffic volumes in Istanbul are huge and the city suffers badly from congestion, so much so that it is the second worst in the world (after Jakarata) for jams. Traffic queuing to use the two existing bridges frequently backs up across the city, resulting in long queues of slow moving (or even stationary) vehicles. The new bridge will help reduce the gridlock that occurs frequently at peak periods, by easing flow across the Bosporus.

The third bridge was conceived some years ago and the need for its construction has grown almost exponentially since it was first proposed. The population of Istanbul is increasing at a fast pace, while Turkey’s vehicle numbers are also growing due to the country’s steady economic development. But the historic city of Istanbul is ill-suited to vehicle traffic in many areas, with its centre in particular featuring many narrow and twisting streets. The new bridge forms part of a programme of infrastructure works intended to ease the traffic flow and prevent gridlock. Other projects include new metro lines and separate busways, both of which are intended to increase the percentage of city commuters using public transport.

Related Content

  • Securing safer transportation infrastructure through non-destructive technology
    June 16, 2014
    Kevin Vine reports on the use of non-destructive testing for structural analysis of bridges Seven years ago, the overpass collapse in Laval, Québec that led to the death of five people brought to light severe issues with the state of the country’s bridges and transportation infrastructure. More recently, a crack in the Champlain Bridge to Montreal that forced over 160,000 commuters to find alternate routes to work reaffirmed a need for greater emphasis on early detection before a crisis occurs.
  • Managing traffic demand is crucial
    June 25, 2012
    Congestion charging can be an effective measure to aid traffic management in major cities. As vehicle use continues to grow worldwide, and fastest of all in developing nations, the problem of congestion is becoming worse in many cities. The mega cities of the developing world suffer particularly in this regard, with infrastructure unable to cope with current traffic volumes, let alone anticipated vehicle numbers for even the near future.
  • Purple haze – the exhaust debate
    May 25, 2016
    Following in the wake of the VW diesel engine emissions scandal, serious questions are finally being asked with regard to exhaust pollution. Car manufacturers have published data on the emissions from their vehicles for many years, but there has been a widespread scepticism as to how these figures have been achieved. The issue of claimed road vehicle exhaust emissions is a case of smoke and mirrors.
  • Major Turkish tunnel projects underway
    September 16, 2014
    A new tunnel will connect the coastal town of Rize with Erzurum in Turkey. The 14.3km Ovit Tunnel is costing US$270.3 million to construct and is due to open to traffic in 2016. Opening the tunnel will reduce the journey time between Rize and Erzurum as the new route will cut the distance from 250-200km. The new route will also provide greater safety for drivers, particularly in winter time as conditions along the existing route can be difficult. So far around 12km of the tunnel has been constructed. Meanw