Skip to main content

Cost rises again for Columbia’s unfinished La Linea tunnel

Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
February 3, 2015 Read time: 2 mins
Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel.

Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as 3260 World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November.

The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-Buenaventura corridor. The link, which will be the longest road tunnel in Latin America, will connect Calarca and Cajamarca in the central Corderilla of the Colombian Andes Mountains.

But the tunnel project has met with numerous challenges -- technical, geophysical, financial and legal. Altitude has made work on site difficult, with two tunnel portals at around 2,500m above sea level.

Last December, World Highways reported that the Segundo Centenario consortium, which is building the tunnel, want to push ahead with construction and it would take around $60 million to finish the project.

A new plan involves the incorporation of local firm Construcciones e Inversiones Beta, which would acquire a 40% stake in the venture and deliver more capital as required. There are also plans to bring in two strategic partners, the cement firms Cementos Argos and 3016 Cemex. These companies could offer credit lines for the materials such as cement, concrete and steel.

In addition, construction firm Carlos Collins, part of the Segundo Centenario consortium, could transfer funds from the Bogota-Girardot project, in which it also has a stake, into La Linea. The consortium has asked for 13 months to complete work on the tunnel.

Details of the road and tunnel construction were featured in World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 17519 0 oLinkExternal last May Visit &quot;tunnel for colombias calarca cajamarca highway&quot; page false /sections/emergent/features/tunnel-for-colombias-calarca-cajamarca-highway/ false false%>.

For more information on companies in this article

Related Content

  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Colombia: nine 4G PPPs to receive financing this year
    March 18, 2016
    Colombia’s minister of transport Natalia Abello Vives has announced that nine 4G public private partnership projects will receive financing this year. Final financing for the Puerta de Hierro-Cruz del Visola road, part of the second wave of 4G projects, will be on June 14, with work to be carried out by Spanish construction firm Sacyr. Construcciones El Condor will carry out the Antioquia-Bolivar and Cesar-Guajira road projects which will also receive financing this year. Other projects include the
  • Algeria gives go ahead for 63km Guelma-Annaba motorway
    December 11, 2014
    Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext