Skip to main content

Cost rises again for Columbia’s unfinished La Linea tunnel

Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
February 3, 2015 Read time: 2 mins
Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel.

Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as 3260 World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November.

The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-Buenaventura corridor. The link, which will be the longest road tunnel in Latin America, will connect Calarca and Cajamarca in the central Corderilla of the Colombian Andes Mountains.

But the tunnel project has met with numerous challenges -- technical, geophysical, financial and legal. Altitude has made work on site difficult, with two tunnel portals at around 2,500m above sea level.

Last December, World Highways reported that the Segundo Centenario consortium, which is building the tunnel, want to push ahead with construction and it would take around $60 million to finish the project.

A new plan involves the incorporation of local firm Construcciones e Inversiones Beta, which would acquire a 40% stake in the venture and deliver more capital as required. There are also plans to bring in two strategic partners, the cement firms Cementos Argos and 3016 Cemex. These companies could offer credit lines for the materials such as cement, concrete and steel.

In addition, construction firm Carlos Collins, part of the Segundo Centenario consortium, could transfer funds from the Bogota-Girardot project, in which it also has a stake, into La Linea. The consortium has asked for 13 months to complete work on the tunnel.

Details of the road and tunnel construction were featured in World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 17519 0 oLinkExternal last May Visit &quot;tunnel for colombias calarca cajamarca highway&quot; page false /sections/emergent/features/tunnel-for-colombias-calarca-cajamarca-highway/ false false%>.

For more information on companies in this article

Related Content

  • Bentley Systems calls for submissions to 2016 Be Inspired Awards
    June 2, 2016
    Bentley Systems, a global provider of software solutions for advancing infrastructure, has announced a call for submissions to the 2016 Be Inspired Awards programme. The deadline for entries is June 10, 2016. The awards, which are selected by independent juries of industry experts, recognise the extraordinary work of organisations that help advance the world’s infrastructure by designing, engineering, constructing, delivering, and/or operating safer, more resilient, sustainable, and intelligent roads,
  • Colombia’s infrastructure development
    December 5, 2013
    Colombia is benefiting from heavy investment in infrastructure that is helping boost the country’s economy. At the same time, tough policies have also reduced crime considerably and helped stabilise economic development. This process of economic growth and overall stabilisation looks set to continue as the Colombian Government has recently unveiled its plans for highway construction over the next 10 years. This infrastructure programme is also tipped to raise demand for surety products owing to government c
  • Bauma 2016 Innovation Awards entries accepted starting today
    April 1, 2015
    Entries are now open for the bauma Innovation Awards to be presented at the international construction and construction equipment trade fair bauma in Munich in 2016. As last time, in 2016 the awards are again being presented in five categories: • Machinery • Components • Construction process/Construction work • Research • Design bauma 2016 in Munich is a major international showcase for construction machinery, building material machines, mining machines, construction vehicles and c
  • Top down parking in South Africa
    July 3, 2015
    Some events defy understanding, many of which happen on the road. But this accident in South Africa really puts gives the imagination a workout. Nobody was injured when a car came crashing through the roof of a small house in Durban, according to the Times Live newspaper. Click here for the report. A person was asleep in a room close to where the vehicle buried itself into the home. The driver, too, escaped and claimed he recalls going over some kind of ramp that launched the car into the air and over the