Skip to main content

Cost rises again for Columbia’s unfinished La Linea tunnel

Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
February 3, 2015 Read time: 2 mins
Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel.

Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as 3260 World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November.

The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-Buenaventura corridor. The link, which will be the longest road tunnel in Latin America, will connect Calarca and Cajamarca in the central Corderilla of the Colombian Andes Mountains.

But the tunnel project has met with numerous challenges -- technical, geophysical, financial and legal. Altitude has made work on site difficult, with two tunnel portals at around 2,500m above sea level.

Last December, World Highways reported that the Segundo Centenario consortium, which is building the tunnel, want to push ahead with construction and it would take around $60 million to finish the project.

A new plan involves the incorporation of local firm Construcciones e Inversiones Beta, which would acquire a 40% stake in the venture and deliver more capital as required. There are also plans to bring in two strategic partners, the cement firms Cementos Argos and 3016 Cemex. These companies could offer credit lines for the materials such as cement, concrete and steel.

In addition, construction firm Carlos Collins, part of the Segundo Centenario consortium, could transfer funds from the Bogota-Girardot project, in which it also has a stake, into La Linea. The consortium has asked for 13 months to complete work on the tunnel.

Details of the road and tunnel construction were featured in World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 17519 0 oLinkExternal last May Visit &quot;tunnel for colombias calarca cajamarca highway&quot; page false /sections/emergent/features/tunnel-for-colombias-calarca-cajamarca-highway/ false false%>.

For more information on companies in this article

Related Content

  • Angry wife tells husband it’s over with a message on a freeway billboard
    October 9, 2015
    Billboards are used to advertise everything, from toothpaste to airplanes and also to get a message across, such as don’t litter the highway. But one wife in Sheffield, United Kingdom, decided to make it personal, and tell her cheating husband that it was all over.
  • LiuGong turns its attention to Europe
    January 6, 2017
    Chinese group explains why it is expanding into Europe, stressing the importance of the market to the long-term health of the industry – and Dressta, the Polish firm LiuGong acquired, talks about its own plans.
  • LiuGong turns its attention to Europe
    April 20, 2015
    Chinese group explains why it is expanding into Europe, stressing the importance of the market to the long-term health of the industry – and Dressta, the Polish firm LiuGong acquired, talks about its own plans.
  • Eurasphalt & Eurobitume Congress 2016 in Prague calls for papers and speakers
    October 8, 2014
    The 6th Eurasphalt & Eurobitume Congress, which is being organised by EAPA & Eurobitume in Prague in the Czech Republic on June 1 to 3 2016, has put out a call for papers. Speakers and authors should submit their abstracts online say the Eurasphalt & Eurobitume Congress 2016 organisers and all papers submitted will receive DOI (Digital Object Identifier) indexation. The organisers say that they “recognise the trend towards online availability of publications and it is the intention to index the proceeding