Skip to main content

Cost rises again for Columbia’s unfinished La Linea tunnel

Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
February 3, 2015 Read time: 2 mins
Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel.

Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as 3260 World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November.

The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-Buenaventura corridor. The link, which will be the longest road tunnel in Latin America, will connect Calarca and Cajamarca in the central Corderilla of the Colombian Andes Mountains.

But the tunnel project has met with numerous challenges -- technical, geophysical, financial and legal. Altitude has made work on site difficult, with two tunnel portals at around 2,500m above sea level.

Last December, World Highways reported that the Segundo Centenario consortium, which is building the tunnel, want to push ahead with construction and it would take around $60 million to finish the project.

A new plan involves the incorporation of local firm Construcciones e Inversiones Beta, which would acquire a 40% stake in the venture and deliver more capital as required. There are also plans to bring in two strategic partners, the cement firms Cementos Argos and 3016 Cemex. These companies could offer credit lines for the materials such as cement, concrete and steel.

In addition, construction firm Carlos Collins, part of the Segundo Centenario consortium, could transfer funds from the Bogota-Girardot project, in which it also has a stake, into La Linea. The consortium has asked for 13 months to complete work on the tunnel.

Details of the road and tunnel construction were featured in World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 17519 0 oLinkExternal last May Visit &quot;tunnel for colombias calarca cajamarca highway&quot; page false /sections/emergent/features/tunnel-for-colombias-calarca-cajamarca-highway/ false false%>.

For more information on companies in this article

Related Content

  • XCMG to create R&D base in the United States
    April 16, 2013
    Leading Chinese construction equipment manufacturing firm XCMG has revealed plans to open a new research and development facility in the United States. Speaking at bauma 2013 Wang Yansong, the company’s vice president, said, “In the second half of this year we are planning to build a R&D centre in the United States. It’ll take about half a year to finish construction. It should open in 2014.” While Yansong would not reveal how much XCMG was investing in the US site, he said it was due to America, along with
  • McBains Cooper wins PPP consultancy contract in Medellin, Colombia
    May 18, 2016
    Construction consultants McBains Cooper has won a contract to help improve public-private partnership skill for the Colombian city of Medellin. McBains will train Medellin PPP Agency to help implement PPP procured projects in the city, Colombia’s second largest. Apart from road works that will include a new urban highway, projects will be across the transportation sector as well as in education such as school construction. Santiago Klein, international director at McBains Cooper, said the objective of
  • Recycled pavement use rises again in the US, according to NAPA
    January 16, 2015
    The use of reclaimed asphalt pavement in the United States increased during 2013 after two years of no rise, according the latest report from the US National Asphalt Pavement Association (NAPA). The report found that more than 73 million tons of reclaimed asphalt pavement and 1.7 million tons of reclaimed asphalt roofing shingles were used in new asphalt pavement mixes in the United States during in 2013. Using recycled asphalt material saved about $2 billion in 2013 over the use of virgin materials,
  • IJM backs out of deal to buy Malaysian road operator SILK
    November 25, 2014
    IJM, one of Malaysia’s largest construction conglomerates, has bailed out of a deal to buy the highways concession business SILK. SILK Holdings, owner of the subsidiary SILK, Sistem Lingkaran-Lebuhraya Kajang, and IJM agreed to end the US$118 million takeover deal that was announced in June, the Sun newspaper reported. SILK holds the concession for the 37km Kajang Traffic Dispersal Ring Road, also called the Silk Highway, until 2037. The road opened in 2004. IJM noted in June, in its filing of intention