Skip to main content

Chile-Argentina Agua Negra Tunnel latest news

Interest is strong in the project to build the Agua Negra Tunnel, which will connect Chile and Argentina. So far 10 consortia have been pre-selected to enter the bidding process for the project. However Ebitan, the joint Chilean/Agentinian commission with responsibility for the project has said it will not release the names of the consortia that have been pre-selected until November 2017 instead.
September 28, 2017 Read time: 2 mins
Interest is strong in the project to build the Agua Negra Tunnel, which will connect Chile and Argentina. So far 10 consortia have been pre-selected to enter the bidding process for the project. However Ebitan, the joint Chilean/Agentinian commission with responsibility for the project has said it will not release the names of the consortia that have been pre-selected until November 2017 instead. The 10 consortia comprise 26 contractors from countries including Argentina, Chile, Italy, Spain and Switzerland. Up to US$1.5 billion of the funding required will be provided by the IADB.

The Agua Negra Tunnel will provide a much needed link between the two countries. At present drivers have the choice of an existing tunnel or a mountain pass. However the tunnel lies at altitude and is often blocked in winter. The mountain pass is narrow and has very twisty connecting roads of questionable safety meaning that it is not suitable for heavy vehicles, while it is even more likely to be blocked by snow in winter.

Related Content

  • Repair, recycling and warm mix technology at Italy’s Asphaltica exibition
    May 15, 2017
    As the name might suggest, the Asphaltica show in Verona, Italy was a good place to catch up on new ideas and applications for bitumen technology. Kristina Smith picked out a few highlights.
  • Argentina deal delayed
    March 6, 2012
    A project to construct much-needed highway links in Argentina now looks to have hit delays. The tender process for the highway projects, which will lie along the Atlantic coast of Buenos Aires Province, has now been held back. A partnership comprising IECSA, Chediack, Coarc, Equimac and Martinez de la Fuente had a proposal for the package of works disqualified due to financial terms of the various deals.
  • David Barwell suggests six steps for closing the UK funding gap
    January 11, 2019
    Six steps for closing the UK funding gap Plenty of private money is seeking UK investment opportunities. The government and the infrastructure sector in general must make projects more attractive, writes David Barwell* It is widely acknowledged that the UK faces mounting economic, environmental and social problems if the nation's infrastructure fails to meet present and future demands. Government estimates propose that almost €561 billion is required to bridge the infrastructure funding gap. As part o
  • Mont Blanc Tunnel maintenance closure
    April 26, 2024
    The Mont Blanc Tunnel will be closed for maintenance.