Skip to main content

Cameroon contracts faces financing problems

A major highway project in Cameroon faces funding issues as China has suspended its financing for the Yaoundé - Douala link. The highway has an estimated cost of US$473.3 million and the project includes a 68km link between the country’s capital and its second city, as well as an additional 23km of link roads. The link is being built by China First Highway Engineering (Cfhec) with funding by Eximbank. However a disagreement between Cameroon and the Chinese has resulted in the funding being halted for a peri
May 25, 2017 Read time: 2 mins

A major highway project in Cameroon faces funding issues as China has suspended its financing for the Yaoundé - Douala link. The highway has an estimated cost of US$473.3 million and the project includes a 68km link between the country’s capital and its second city, as well as an additional 23km of link roads. The link is being built by China First Highway Engineering (Cfhec) with funding by Eximbank. However a disagreement between Cameroon and the Chinese has resulted in the funding being halted for a period of month, with the potential of time extensions to this. Part of the problem is that the Cameroon authorities opted to increase the speed limit on the highway from 100km/h planned by the Chinese designers to 110km/h in line with French speed limits. It is not clear how this dispute can be resolved at this stage.

Related Content

  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • Bosnia-Croatia link discussed
    July 13, 2012
    Bosnia and Croatia are looking to discuss a new highway construction project to link the two countries. The Adriatic-Ionic section of the Corridor VC motorway looks likely to pass through Bosnia. The plan is to build a total of 110km of roads, out of the planned 336km on the Corridor VC, by 2012.
  • Road loan for Dominican Republic
    March 16, 2012
    A US$130 million loan will help finance the Viadom road network in the Dominican Republic.
  • Better roads through asphalt plant innovation
    August 19, 2014
    In Africa, one of the world’s fastest-growing cities is using the latest asphalt plant technology to boost its road maintenance work; while leading firms are finding their innovative solutions in demand in Europe and the Americas. Guy Woodford reports A new up to 180tonnes/hour Marini UltiMAP 2000 plant is helping Lagos State Public Works in Lagos, Nigeria implement a five-year strategic road map aiming to ensure high standards of road maintenance and improve infrastructural development across the city of m