Skip to main content

Cameroon contracts faces financing problems

A major highway project in Cameroon faces funding issues as China has suspended its financing for the Yaoundé - Douala link. The highway has an estimated cost of US$473.3 million and the project includes a 68km link between the country’s capital and its second city, as well as an additional 23km of link roads. The link is being built by China First Highway Engineering (Cfhec) with funding by Eximbank. However a disagreement between Cameroon and the Chinese has resulted in the funding being halted for a peri
May 25, 2017 Read time: 2 mins

A major highway project in Cameroon faces funding issues as China has suspended its financing for the Yaoundé - Douala link. The highway has an estimated cost of US$473.3 million and the project includes a 68km link between the country’s capital and its second city, as well as an additional 23km of link roads. The link is being built by China First Highway Engineering (Cfhec) with funding by Eximbank. However a disagreement between Cameroon and the Chinese has resulted in the funding being halted for a period of month, with the potential of time extensions to this. Part of the problem is that the Cameroon authorities opted to increase the speed limit on the highway from 100km/h planned by the Chinese designers to 110km/h in line with French speed limits. It is not clear how this dispute can be resolved at this stage.

Related Content

  • The new agile world of the construction equipment industry
    June 22, 2015
    while worldwide for 2015 a crystalball would be helpful, in Europe the sector has already listed specific priorities it wants to tackle, and among these are the upcoming emissions regulations (see separate story), external trade and access to foreign markets, and market surveillance.
  • Julián Núñez, head of ASECAP offers a little Spanish enlightenment
    May 1, 2018
    Julián Núñez, president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth. People want to avoid the pain. This is perhaps a bad analogy to use in the case of Julián Núñez, president of ASECAP - European Association of Operators of Toll Road Infrastructures. Núñez had just sat
  • Many Moroccan motorway projects now in hand
    November 11, 2014
    Morocco’s Casablanca-Rabat motorway accounts for almost 20% of motorway tolls in the country, generating US$25.16 million for Autoroutes du Maroc (ADM) in the first half of 2014, a growth of 4.1% from the previous year. With relatively low maintenance costs (mainly used for widening the road) the Casablanca-Rabat motorway is ADM's most profitable route. The 76km route is travelled by 51,000 vehicles/day, far higher than any other motorway. The Berrechid-Agadir motorway (which includes Berrechid-Marrakesh an
  • India road project faces further delay
    June 14, 2018
    A major road project in India’s Uttar Pradesh State now looks to be facing further delays. The state authorities have cancelled the bidding process for the Poorvanchal Expressway for the second time. The 341km project was being opened to tenders in eight segments. However the state authorities were concerned that the bids made for the work were substantially larger than the expected, with the total cost originally estimated at US$1.74 billion. A new tender process will be initiated instead, with the state a