Skip to main content

Brunie bridge building bids

Four Chinese contractors are involved in the bidding process for work on Brunei’s Temburong Bridge project. This is the second phase for the bridge project, as a local contractor, Swee, and a South Korean company, Daelim Industrial, won the tender process for the first phase of the work. There are five phases in all for the 30km Temburong Bridge project. In all the project is expected to cost some US$1.21 billion to construct. The names of all of the bidders for the second phase have not so far been release
April 30, 2015 Read time: 1 min
Four Chinese contractors are involved in the bidding process for work on Brunei’s Temburong Bridge project. This is the second phase for the bridge project, as a local contractor, Swee, and a South Korean company, 3088 Daelim Industrial, won the tender process for the first phase of the work. There are five phases in all for the 30km Temburong Bridge project. In all the project is expected to cost some US$1.21 billion to construct. The names of all of the bidders for the second phase have not so far been released although 890 China Railway Construction is known to be among the Chinese companies competing for the tender.

For more information on companies in this article

Related Content

  • US$1.54 billion Chinese mega bridge planned
    April 1, 2024
    A US$1.54 billion Chinese mega bridge project is being planned.
  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.
  • Rapid replacement of multiple bridges – the plan
    December 14, 2017
    The US State of Pennsylvania is saving itself $220 million over 10 years on a programme to replace 558 bridges with an unusual public private partnership approach - Kristina Smith writes It is called the Rapid Bridge Replacement Programme with good reason. Pennsylvania’s Department of Transport, PennDOT, wants to see no less than 558 structurally deficient bridges replaced with newly designed and constructed ones, all within four years. Using traditional forms of procurement this programme would be like
  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.