Skip to main content

Brisbane’s Legacy Way Tunnel is open to traffic

An official opening has been carried out for Australia’s Legacy Way Tunnel. The 4.6km route located in Brisbane, Queensland is open to traffic. The construction project was handled by Transcity, formed by Spanish contractor firm Acciona along with BMD Constructions and Ghella. This is the first major project in Australia with which Acciona has been directly involved. The project was awarded in 2010 and cost in the region of US$1.64 billion to construct. It was originally due for completion in late 2014. The
June 4, 2015 Read time: 2 mins
An official opening has been carried out for Australia’s Legacy Way Tunnel. The 4.6km route located in Brisbane, Queensland is open to traffic. The construction project was handled by Transcity, formed by Spanish contractor firm 976 Acciona along with BMD Constructions and Ghella. This is the first major project in Australia with which Acciona has been directly involved. The project was awarded in 2010 and cost in the region of US$1.64 billion to construct. It was originally due for completion in late 2014. The tolled route is expected to carry some 34,200 vehicles/day and the tunnel project was intended to cut congestion in Brisbane, reducing journey times between the Inner City Bypass and the Centenary Bridge by 70%. The tunnel features twin tubes, each 12m in diameter. It will be tolled for 45 years, with funding having come from state and federal sources as well as the local council.

For more information on companies in this article

Related Content

  • Legacy Way underground road tunnel in Brisbane to cost US$1.57bn
    November 21, 2012
    The 5km Legacy Way underground road tunnel in Brisbane, Australia will cost US$1.57 billion (AUD 1.50bn). Brisbane City Council (BCC) will borrow US$ 1.04 billion (AUD 1bn) from the Queensland Treasury Corporation (QTC) on a 30-year loan to help fund the works. Meanwhile the federal government will contribute US$520.92 million (AUD 500mn) to the project. The tunnel is expected to carry 24,000 cars a day when it opens in 2015. The Clem 7 and Airport Link are two tunnels already operating in Brisbane.
  • VIDEO: Nexus picks up Toowoomba bypass project in Queensland, Australia
    August 21, 2015
    Nexus Infrastructure group has signed a contract with the Australian government to deliver the Toowoomba Second Range Crossing project in Queensland state, costing nearly US$1.2 billion.

    Nexus will design construct, finance, operate and maintain the 41km route that will bypass the city of Toowoomba, east to west.

    Toowomba and district, with a population of around 158,000, is inland 125km west of Queensland's capital city Brisbane, on Australia’s northeast coast.
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk