Skip to main content

Algeria signs off two contracts of Hauts Plateaux motorway work

The Algerian Council of Ministers has approved two contracts for stretches of road on the Hauts Plateaux motorway. No details of the contractors were given for the work that is to link Lambidiri to Draa Lahmar via Ouled Fadhel. Construction is expected to take 18 months. Last March, World Highways reported that work on the 1,000km Hauts-Plateaux motorway project was to begin that month. Construction cost for motorway’s 10 sections was estimated to be around US$8.94 billion, according to Algerian Minis
January 5, 2015 Read time: 2 mins
The Algerian Council of Ministers has approved two contracts for stretches of road on the Hauts Plateaux motorway.

No details of the contractors were given for the work that is to link Lambidiri to Draa Lahmar via Ouled Fadhel. Construction is expected to take 18 months.

Last March, 3260 World Highways reported that work on the 1,000km Hauts-Plateaux motorway project was to begin that month. Construction cost for motorway’s 10 sections was estimated to be around US$8.94 billion, according to Algerian Minister for Public Works Farouk Chiali.

He said local firms are being contracted to carry out the works exclusively, with each section requiring 36 months of work.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The government announced early last year Visit &quot;nearly dzd 4,300 bn devoted to public works sector by 2019&quot; page false http://www.aps.dz/en/economy/1176-nearly-dzd-4,300-bn-devoted-to-public-works-sector-by-2019 false false%> that it had earmarked around US$53 billion development of the infrastructure including roads, motorways and civil engineering structures in the next five-year plan, from 2015-2019.

Chiali, who made the announcement, said road improvements will include construction of more than 1,000km of motorways including the Hauts Plateaux project, 700km of expressways and bypasses and more than 7,000km of trunk roads and secondary roads. Around 1,500 public engineering projects will also receive funding, he said.

Major improvements will also be made to road signage, according to a report by the national news agency Algerie Presse Service. New urban motorways will link the Mediterranean ports of Tenes, Bejaia and Jijel to the East-West Motorway.

The total cost of the East-West Motorway was around $11 billion with work done by several Chinese-Japanese consortia.

For more information on companies in this article

Related Content

  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    February 13, 2013
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t
  • Sumitomo intends to boost its paver sales worldwide, as vice president international sales Ichiro Shimada explained
    January 6, 2017
    Sumitomo Construction Machinery intends to continue boosting export markets – a project that has been in hand for three years – according to vice president international sales Ichiro Shimada. “Sumitomo is dominant in Japan and we have 70% market share. But the market size is limited, maybe 400 units/year. We’re putting a lot of effort into the Chinese market,” said Shimada. Europe is another key market for Sumitomo and the firm is focussing on countries such as France, Poland and Switzerland, while it has a
  • Sumitomo intends to boost its paver sales worldwide, as vice president international sales Ichiro Shimada explained
    April 18, 2012
    Sumitomo Construction Machinery intends to continue boosting export markets – a project that has been in hand for three years – according to vice president international sales Ichiro Shimada. “Sumitomo is dominant in Japan and we have 70% market share. But the market size is limited, maybe 400 units/year. We’re putting a lot of effort into the Chinese market,” said Shimada. Europe is another key market for Sumitomo and the firm is focussing on countries such as France, Poland and Switzerland, while it has a