Skip to main content

Algeria signs off two contracts of Hauts Plateaux motorway work

The Algerian Council of Ministers has approved two contracts for stretches of road on the Hauts Plateaux motorway. No details of the contractors were given for the work that is to link Lambidiri to Draa Lahmar via Ouled Fadhel. Construction is expected to take 18 months. Last March, World Highways reported that work on the 1,000km Hauts-Plateaux motorway project was to begin that month. Construction cost for motorway’s 10 sections was estimated to be around US$8.94 billion, according to Algerian Minis
January 5, 2015 Read time: 2 mins
The Algerian Council of Ministers has approved two contracts for stretches of road on the Hauts Plateaux motorway.

No details of the contractors were given for the work that is to link Lambidiri to Draa Lahmar via Ouled Fadhel. Construction is expected to take 18 months.

Last March, 3260 World Highways reported that work on the 1,000km Hauts-Plateaux motorway project was to begin that month. Construction cost for motorway’s 10 sections was estimated to be around US$8.94 billion, according to Algerian Minister for Public Works Farouk Chiali.

He said local firms are being contracted to carry out the works exclusively, with each section requiring 36 months of work.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The government announced early last year Visit &quot;nearly dzd 4,300 bn devoted to public works sector by 2019&quot; page false http://www.aps.dz/en/economy/1176-nearly-dzd-4,300-bn-devoted-to-public-works-sector-by-2019 false false%> that it had earmarked around US$53 billion development of the infrastructure including roads, motorways and civil engineering structures in the next five-year plan, from 2015-2019.

Chiali, who made the announcement, said road improvements will include construction of more than 1,000km of motorways including the Hauts Plateaux project, 700km of expressways and bypasses and more than 7,000km of trunk roads and secondary roads. Around 1,500 public engineering projects will also receive funding, he said.

Major improvements will also be made to road signage, according to a report by the national news agency Algerie Presse Service. New urban motorways will link the Mediterranean ports of Tenes, Bejaia and Jijel to the East-West Motorway.

The total cost of the East-West Motorway was around $11 billion with work done by several Chinese-Japanese consortia.

For more information on companies in this article

Related Content

  • Skako Concrete unveils its Rotoconix mixer
    April 15, 2013
    Skako Concrete has – literally – unveiled its new Rotoconix mixer after keeping the new model under cover until 11am on the first day of bauma. The Rotoconix is designed for quick batching cycles, fast discharge and uniform mixing no matter the batch size. The mixer has three key parts, all of which are reversible. It combines a rotating cone a high-speed ‘turbo whirler’ and a screw.
  • Haulotte sees sales growth in 2012
    January 6, 2017
    French access and telehandler manufacturer Haulotte returned to profit in 2012 and, though the first quarter of 2013 is down year-on-year, CEO Alexandre Saubot remains confident about continued growth this year. “We achieved a decent performance in 2012 with almost 16% growth,” said Saubot. “2013 will remain a challenge for us, we will have to continue to work hard for sales growth.”
  • Haulotte sees sales growth in 2012
    April 18, 2013
    French access and telehandler manufacturer Haulotte returned to profit in 2012 and, though the first quarter of 2013 is down year-on-year, CEO Alexandre Saubot remains confident about continued growth this year. “We achieved a decent performance in 2012 with almost 16% growth,” said Saubot. “2013 will remain a challenge for us, we will have to continue to work hard for sales growth.”
  • Volvo launches traction control for asphalt pavers at INTERMAT
    January 6, 2017
    Volvo latest pavers, the P7820C ABG and P8820C ABG, get independent travel drives and electronic traction control to maintain productivity on slopes and around corners. The P8820C ABG tracked paver from Volvo Construction Equipment can pave widths up to 13metres, while the P7820C ABG paves up to 11metres. Expect up to 900tonnes/hour from the smaller paver and up to 1,000tonnes/hour from the larger machine. Power comes from Volvo’s latest D8 stage IIIB emissions compliant six-cylinder, seven-litre engine. Th