Skip to main content

ADB loan for Armenia-Georgia highway

Approval for a US$50 million loan to develop a highway stretch in Armenia has been given by the Asian Development Bank (ADB). The loan will be used to upgrade the M6 Highway from Vanadzor in Armenia to the country’s border with Georgia at Bagratashen. The route is one of the most strategic roads for internal and external trade for landlocked Armenia while it also lies close to the country’s border with Azerbaijan. The upgrading of this highway will also provide an important link to the Black Sea Ring Road p
November 4, 2016 Read time: 3 mins
Approval for a US$50 million loan to develop a highway stretch in Armenia has been given by the Asian Development Bank (ADB). The loan will be used to upgrade the M6 Highway from Vanadzor in Armenia to the country’s border with Georgia at Bagratashen. The route is one of the most strategic roads for internal and external trade for landlocked Armenia while it also lies close to the country’s border with Azerbaijan. The upgrading of this highway will also provide an important link to the %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 27889 0 oLinkExternal Black Sea Ring Road project Visit WH story page false /sections/emergent/features/black-sea-countries-complete-preparations-for-implementation-of-black-sea-ring-project/ false false%>.

Jiangbo Ning, principal transport specialist with ADB’s Central West Asia Regional Department commented, “Road transport plays an important role in the national economy of Armenia, which relies heavily on trade with neighboring countries like Georgia. ADB supports the government’s priority to develop and increase the efficiency of the transport system as a prerequisite for economic growth, and for increased access to social and economic services.”

The M6 highway provides a key link between Armenia and Georgia, providing the shortest route between the respective capitals: Yerevan and Tbilisi. In 2014, the Bagratashen border crossing handled 850,000 tonnes of import and export freight. This is close half of the country’s total import freight tonnage and goods by road.

The need for an upgrade to the highway is acute as its condition is poor in places. According to the ADB, some structures are dangerous and need to be rebuilt immediately. Every year, landslides, flooding, falling rocks, and heavy snowfall cause road closures. These factors have also contributed to a poor safety record.

These problems are mainly attributed to a lack of maintenance due to limited maintenance, old road design and technical specifications, and a lack of qualified human resources and contractors, as well as consulting companies with the necessary knowledge and skills to conduct maintenance.

The project will rehabilitate and upgrade 51.5km of the total 90km of the two-lane M6 highway. Upgrades for the remaining 38.5km will be financed by the European Investment Bank (EIB). Facilities and safety along and in the vicinity of this road section in northern Armenia will be improved, and the institutional capacity of the Ministry of Transport and Communications will be strengthened.

ADB is also providing additional support to help the Armenian Government take steps to increase the budget allocation for road maintenance.

Related Content

  • Herrenkencht has developed a novel pipeline installation package
    February 6, 2013
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • Novel trenchless technology development from TRACTO-TECHNIK
    January 6, 2017
    TRACTO-TECHNIK intends to maintain its position as a leader in the field for trenchless tunnelling technology with the launch of some innovative new designs with its Black Mole and latest Grundomat N design, as well as other key introductions. Its 7th Grundomat N generation features an innovative crowned head form that is said to guarantee a high penetration force and target precision in stony soils. The GRUNDOMAT N is optionally available with the proven stepped head from the previous generation. A further
  • Novel trenchless technology development from TRACTO-TECHNIK
    January 30, 2013
    TRACTO-TECHNIK intends to maintain its position as a leader in the field for trenchless tunnelling technology with the launch of some innovative new designs with its Black Mole and latest Grundomat N design, as well as other key introductions. Its 7th Grundomat N generation features an innovative crowned head form that is said to guarantee a high penetration force and target precision in stony soils. The GRUNDOMAT N is optionally available with the proven stepped head from the previous generation. A further
  • Tesab 1200TC tracked cone crusher with Cat C13 engine
    March 26, 2013
    New to the Tesab range of crushing and screening equipment is the 1200TC tracked cone crusher, a development that completes the company’s range of crushing and screening equipment. The 1,200mm diameter cone crusher unit is a well proven design having established itself in static applications in Scandinavia and Australasia.