Skip to main content

Kentucky’s 1931 Ledbetter road Bridge comes to an explosive end

Specialist demolition contractors working for the Kentucky Transportation Cabinet have successfully brought down one truss span of the Old Ledbetter Bridge near Paducah. The bridge has been taking traffic across the Mississippi River since 1931. Boat traffic on the Tennessee River was halted for about 90 minutes by the U.S. Coast Guard. KYTC said there were several audible warning signals, then a countdown, followed by a flash and puff of smoke from the explosive charges. As sound of the explosion echoed a
October 1, 2014 Read time: 2 mins
Specialist demolition contractors working for the Kentucky Transportation Cabinet have successfully brought down one truss span of the Old Ledbetter Bridge near Paducah. The bridge has been taking traffic across the Mississippi River since 1931.

Boat traffic on the Tennessee River was halted for about 90 minutes by the U.S. Coast Guard. KYTC said there were several audible warning signals, then a countdown, followed by a flash and puff of smoke from the explosive charges. As sound of the explosion echoed along the river banks, KYTC said the steel truss dropped into about 30 feet (10m) of water below the bridge.

Once an all-clear was issued, river traffic was allowed to resume and a crane was moved in to start pulling steel from the river. The constractor believes it should take about 48 hours to remove the steel and place it on barges to be hauled to a scrap yard.

See it happen on the video below, which was forwarded to World Highways by Demolition News website:

Related Content

  • Papua New Guinea mends its bridges
    February 28, 2022
    Under the latest tranche of the Sustainable Highlands Highway Investment Programme, 45 of the estimated 71 bridges will be completely replaced.
  • Mixed US transportation outlook for 2012 according to ARTBA
    April 26, 2012
    The outlook for the 2012 transportation construction market is mixed, according to the American Road & Transportation Builders Association's (ARTBA). The 2012 Transportation Construction Market forecast from ARTBA shows that the industry will face uncertain times during next year.
  • Mullum Mullum Valley untouched by progress
    July 20, 2012
    Preserving the unspoiled Mullum Mullum Valley was the major consideration when deciding to build a traffic tunnel The answer to one of the major issues facing construction of the A$2.5 billion EastLink route in Australia was simple: construct a tunnel. While it was expensive, those involved realised they had little option but to go underground to protect the environmentally sensitive Mullum Mullum Valley, an untouched area of wood and bushland in Melbourne. EastLink, the 39km toll road project on the easter
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.