Skip to main content

Kentucky’s 1931 Ledbetter road Bridge comes to an explosive end

Specialist demolition contractors working for the Kentucky Transportation Cabinet have successfully brought down one truss span of the Old Ledbetter Bridge near Paducah. The bridge has been taking traffic across the Mississippi River since 1931. Boat traffic on the Tennessee River was halted for about 90 minutes by the U.S. Coast Guard. KYTC said there were several audible warning signals, then a countdown, followed by a flash and puff of smoke from the explosive charges. As sound of the explosion echoed a
October 1, 2014 Read time: 2 mins
Specialist demolition contractors working for the Kentucky Transportation Cabinet have successfully brought down one truss span of the Old Ledbetter Bridge near Paducah. The bridge has been taking traffic across the Mississippi River since 1931.

Boat traffic on the Tennessee River was halted for about 90 minutes by the U.S. Coast Guard. KYTC said there were several audible warning signals, then a countdown, followed by a flash and puff of smoke from the explosive charges. As sound of the explosion echoed along the river banks, KYTC said the steel truss dropped into about 30 feet (10m) of water below the bridge.

Once an all-clear was issued, river traffic was allowed to resume and a crane was moved in to start pulling steel from the river. The constractor believes it should take about 48 hours to remove the steel and place it on barges to be hauled to a scrap yard.

See it happen on the video below, which was forwarded to World Highways by Demolition News website:

Related Content

  • Komatsu PC490HRD-11 K100 goes to work
    September 20, 2021
    In June 2021, Komatsu announced a new variant of their PC490HRD-11 high reach demolition machine featuring a brand-new boom connection system. Named “K100”, the new system allows the operator to change the configuration of the machine singlehandedly in only a few minutes, without leaving the comfort of the operator cab. One of the first of these new machines recently went to work in Bradford, UK.
  • Key deals show strength of Tolling solutions sector
    September 26, 2013
    The world’s leading tolling solution providers have achieved significant deals in recent months emphasising the importance of their latest and proven technology. Guy Woodford reports Kapsch TrafficCom North America (Kapsch), part of Kapsch TrafficCom Group, has been awarded a five-year US$30 million contract by Canadian Tolling Company International (Cantoll). The contract will see the leading tolling technology manufacturer supply its next generation TDMA V6 Interior Transponder, also known as an onboar
  • Versatile pavement re-texturing machine
    February 6, 2012
    AN INNOVATIVE wet steel shotblasting machine developed by pavement re-texturing specialist Klaruw is now being tested in the UK.
  • Fast bridge building in Tennessee
    July 5, 2016
    The Tennessee Department of Transportation (TDOT) recently completed the Fast Fix 8 bridge project in Nashville, with help from a Power Curbers slipformer belonging to Irwin Concrete Construction. TDOT’s goal was to replace eight ageing interstate bridges along Interstate 40 through Nashville using a process called Accelerated Bridge Construction (ABC). This uses fast-paced, around-the-clock work to limit road closures and speed up bridge completion, impacting surrounding communities as little as possibl