Skip to main content

New tunnel linings from Trelleborg

Trelleborg has unveiled its innovative cast-in profile sealing system at the recent 2017 Rapid Excavation & Tunnelling Conference (RETC). The firm says that its latest cast-in profile sealing systems are designed to help ensure that tunnelling projects keep to project timescales and budgets. The design of the units also helps to shorten the production process of concrete tunnel gaskets according to the firm.
August 2, 2017 Read time: 2 mins

Trelleborg has unveiled its innovative cast-in profile sealing system at the recent 2017 Rapid Excavation & Tunnelling Conference (RETC). The firm says that its latest cast-in profile sealing systems are designed to help ensure that tunnelling projects keep to project timescales and budgets. The design of the units also helps to shorten the production process of concrete tunnel gaskets according to the firm.

The units have been developed to meet the needs of the tunnelling sector, with drives that are deeper and bores that are larger in diameter, as well as being in more challenging conditions than in the past. Time penalties mean that there is growing pressure to complete these projects to tighter deadlines, while meeting increasing demands for performance and safety. However, on many projects, concrete tunnel segments are fitted with rubber gaskets onsite and secured using adhesive, which Trelleborg says can lead to time-consuming and cost-intensive repair work as a result of displacement between segments that are not accurately positioned. This can reduce the gasket’s ability to withstand water pressure, exerting negative effects on the outcome of a project.

To combat the issue, the firm’s sealing system is precast into the tunnel segment during manufacture, removing the need for adhesive on installation. This saves time and the gasket forges a strong bond with the segment to improve installation accuracy and ensure increased watertight performance. By saving time, the novel Trelleborg units can reduce installation time considerably, delivering major cost savings and also helping ensure that project timelines remain on schedule.

Related Content

  • New ADTs offer low emissions performance and fast cycle times
    December 2, 2014
    Its incredible versatility means that the articulated dumptruck (ADT) has become a popular piece of equipment for quarrying or earthmoving applications. For quarrying in particular, the machines are highly useful as they are able to cope with steeper ramp hauls and tougher terrain than rigid haulers offering similar payloads.
  • Effective demarcation boosts traffic safety
    July 29, 2015
    Effective demarcation can play a crucial role in boosting safety for road users. Good demarcation is vital on a road network to help ensure that drivers stay in the correct lanes and are warned of changes that lie in their path, for example. Road markings are hugely important and for those involved in maintenance, ensuring that these are visible at night and in poor weather can help maximise safety. New technology is on the market now that can help road authorities ensure that road markings meet requirement
  • Norwegians would build new bridge and tunnel links
    June 18, 2021
    Norway’s road transport network is changing radically as the country gears up for greater EV use as well as a gradual phasing out of its traditional ferry links
  • Kijlstra’s new culverts expand its production portfolio
    October 12, 2017
    A new mould is now in operation for Kijlstra in its UK factory, allowing the firm to produce a larger range of culverts. The specialist precast concrete drainage manufacturer says that the new moulds also allow for faster production and lead times. As the new moulds are adaptable a wider range of culvert configurations can be offered. The firm can now produce a range of sizes up to 2.1m in height and 3.6m in width, with a standard wall and slab thickness of 250mm.