Skip to main content

New tunnel linings from Trelleborg

Trelleborg has unveiled its innovative cast-in profile sealing system at the recent 2017 Rapid Excavation & Tunnelling Conference (RETC). The firm says that its latest cast-in profile sealing systems are designed to help ensure that tunnelling projects keep to project timescales and budgets. The design of the units also helps to shorten the production process of concrete tunnel gaskets according to the firm.
August 2, 2017 Read time: 2 mins

Trelleborg has unveiled its innovative cast-in profile sealing system at the recent 2017 Rapid Excavation & Tunnelling Conference (RETC). The firm says that its latest cast-in profile sealing systems are designed to help ensure that tunnelling projects keep to project timescales and budgets. The design of the units also helps to shorten the production process of concrete tunnel gaskets according to the firm.

The units have been developed to meet the needs of the tunnelling sector, with drives that are deeper and bores that are larger in diameter, as well as being in more challenging conditions than in the past. Time penalties mean that there is growing pressure to complete these projects to tighter deadlines, while meeting increasing demands for performance and safety. However, on many projects, concrete tunnel segments are fitted with rubber gaskets onsite and secured using adhesive, which Trelleborg says can lead to time-consuming and cost-intensive repair work as a result of displacement between segments that are not accurately positioned. This can reduce the gasket’s ability to withstand water pressure, exerting negative effects on the outcome of a project.

To combat the issue, the firm’s sealing system is precast into the tunnel segment during manufacture, removing the need for adhesive on installation. This saves time and the gasket forges a strong bond with the segment to improve installation accuracy and ensure increased watertight performance. By saving time, the novel Trelleborg units can reduce installation time considerably, delivering major cost savings and also helping ensure that project timelines remain on schedule.

Related Content

  • Crushing and screening innovation for quarries
    November 5, 2012
    Novel crushing and screening developments are coming to market - Mike Woof reports A wide array of innovations and market developments are occurring in the sector for quarrying machinery. New technologies are being introduced while business developments are also changing the face of this market segment. There is strong interest in new technology from industry too and this was well highlighted by data from the organisers of the Hillhead quarry show in the UK. The organisers revealed that there was a jump of
  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • Intelligent paving and compaction holds the key
    October 16, 2024
    Intelligent paving and compaction holds the key to more efficient road construction according to BOMAG – Mike Woof writes
  • Progression in concrete plant and mixing solutions
    July 14, 2014
    Big orders for and progress in plant and concrete mixing technology has been continuing at a rapid pace over recent months, as Guy Woodford reports Shantui recently completed an eye-catching US$3.2 million deal with a customer in the United Arab Emirates for 50 concrete mixer trucks. The deal is said to be an important breakthrough for the Chinese company’s concrete machinery in the Middle East market, raising brand awareness and laying a solid foundation for building market share. Over the past y