Skip to main content

Key Quebec bridge connection resurfacing contract

A new road surface is required for the Ile-d'Orleans Bridge in Quebec, Canada. The resurfacing work is needed just four years after the surfacing works were completed. The problem is caused by a combination of the tough winter weather and the age of the bridge, which requires the asphalt to be laid in a much thinner layer than on more recent structures. The thin layer of asphalt is vulnerable to cracking and damage and this has resulted in rapid wear due to the freeze thaw effect. The maintenance work is ex
August 15, 2014 Read time: 1 min

A new road surface is required for the Ile-d'Orleans Bridge in Quebec, Canada. The resurfacing work is needed just four years after the surfacing works were completed. The problem is caused by a combination of the tough winter weather and the age of the bridge, which requires the asphalt to be laid in a much thinner layer than on more recent structures. The thin layer of asphalt is vulnerable to cracking and damage and this has resulted in rapid wear due to the freeze thaw effect. The maintenance work is expected to cost US$378,000 (C$415,000).

Related Content

  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna
  • BOMAG joins innovative repair
    February 6, 2012
    A durable and cost-efficient method of road rehabilitation has been carried out on a local road in Germany using an innovative cold recycling technology.
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport