Skip to main content

Key Quebec bridge connection resurfacing contract

A new road surface is required for the Ile-d'Orleans Bridge in Quebec, Canada. The resurfacing work is needed just four years after the surfacing works were completed. The problem is caused by a combination of the tough winter weather and the age of the bridge, which requires the asphalt to be laid in a much thinner layer than on more recent structures. The thin layer of asphalt is vulnerable to cracking and damage and this has resulted in rapid wear due to the freeze thaw effect. The maintenance work is ex
August 15, 2014 Read time: 1 min

A new road surface is required for the Ile-d'Orleans Bridge in Quebec, Canada. The resurfacing work is needed just four years after the surfacing works were completed. The problem is caused by a combination of the tough winter weather and the age of the bridge, which requires the asphalt to be laid in a much thinner layer than on more recent structures. The thin layer of asphalt is vulnerable to cracking and damage and this has resulted in rapid wear due to the freeze thaw effect. The maintenance work is expected to cost US$378,000 (C$415,000).

Related Content

  • Recycled asphalt innovations prove cost benefit
    November 5, 2012
    New technologies allow efficient use of recycled asphalt - Mike Woof writes The Eurobitume/Euroasphalt 2012 event in Istanbul earlier this year proved an important event with regard to asphalt recycling innovations. Key developments in this technology were announced, particularly in the field of asphalt production. One of the notable papers came from E-MAK, part of the Turkish Simge Group, which focused on its RATEK system. This technology is designed to use recycled asphalt and can produce greater throughp
  • FM Conway and TfL set “benchmark” for RAP use in A40 project
    November 30, 2017
    Infrastructure services company FM Conway and the UK’s Transport for London (TfL) have set “a new benchmark” for recycling in the highways industry.
  • Vögele's global paving vision
    January 4, 2013
    German paver specialist Vögele is taking a global view of the construction equipment market, with machines developed for very different markets. A prime example of this is with the Dash 3 models now coming to market. The new SUPER 2100-3 paver is also available as the SUPER 2100-3i, a highly sophisticated machine that meets the European emissions requirements while offering high productivity and performance. At the same time, the company is also offering a heavy duty (HD) version of its proven SUPER 1800-2
  • Milling and paving for a highway repair in Oklahoma
    April 5, 2017
    Milling and paving work has helped restore the road surface on an important stretch of highway in the US state of Oklahoma. US Highway 62 is a key route, running 3,597km from to Niagara Falls, New York, at the Canada–US border to the Mexico-US border at El Paso in Texas. It is the only east-west United States numbered highway that connects Canada with Mexico through the US, making it a key transport route. A 12km section of US 62 where it runs through Oklahoma recently benefited from a much-needed rebuild,