Skip to main content

Key Quebec bridge connection resurfacing contract

A new road surface is required for the Ile-d'Orleans Bridge in Quebec, Canada. The resurfacing work is needed just four years after the surfacing works were completed. The problem is caused by a combination of the tough winter weather and the age of the bridge, which requires the asphalt to be laid in a much thinner layer than on more recent structures. The thin layer of asphalt is vulnerable to cracking and damage and this has resulted in rapid wear due to the freeze thaw effect. The maintenance work is ex
August 15, 2014 Read time: 1 min

A new road surface is required for the Ile-d'Orleans Bridge in Quebec, Canada. The resurfacing work is needed just four years after the surfacing works were completed. The problem is caused by a combination of the tough winter weather and the age of the bridge, which requires the asphalt to be laid in a much thinner layer than on more recent structures. The thin layer of asphalt is vulnerable to cracking and damage and this has resulted in rapid wear due to the freeze thaw effect. The maintenance work is expected to cost US$378,000 (C$415,000).

Related Content

  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Newly constructed low-noise asphalt surface fails
    May 15, 2012
    Questions are being asked over the construction of a new section of the A1 autobahn in Germany. The highway stretch is being scrutinised due to surface failures and lies close to the city of Bremen but has been open for less than three months.
  • Bitumen provides more durable road surface
    February 7, 2012
    When the main commuter route into Cardiff, the Welsh capital, began to suffer from acute deformation, the Vale of Glamorgan Council required a durable and faster alternative to hot rolled asphalt to ensure minimum disruption for local road users.
  • New system for patching roads from Bituchem
    December 24, 2014
    Bituchem’s FortSeal product has been applied to a countryside highway in Leicestershire to preserve and maintain the road surfacing. The FortSeal preservation product is undergoing a trial by Leicestershire County Council in the UK to assess its future potential in positively affecting the council’s road maintenance budget by prolonging the life of the county’s roads.