Skip to main content

Zambia road rebuild by mining firm

A key road rebuild contract has been carried out in Zambia by mining firm First Quantum Minerals (FQM). The firm used its own equipment to rebuild a road that connects with its mining operations in Zambia’s North-Western Province. The firm opted to maintain the Chingola-Solwezi road, which had deteriorated to such a state that North-Western Province faced being cut-off from the rest of the country during the rainy season. This was a serious issue for the mining firm as the poor state of the road threatened
May 30, 2017 Read time: 3 mins
In all 105 of FQM’s personnel worked on the road repair job
A key road rebuild contract has been carried out in Zambia by mining firm First Quantum Minerals (FQM)


The firm used its own equipment to rebuild a road that connects with its mining operations in Zambia’s North-Western Province. The firm opted to maintain the Chingola-Solwezi road, which had deteriorated to such a state that North-Western Province faced being cut-off from the rest of the country during the rainy season. This was a serious issue for the mining firm as the poor state of the road threatened to halt its mining operations in the area.

FQM is Africa’s largest copper producer and the need to repair the road was vital for its own operations, as well as for the wider economic and social impact by boosting transport and trade in the north of Zambia. To carry out the work, the company deployed 105 staff and 65 pieces of equipment. The team included road engineers and labour to carry out the necessary work on the road, which carries 60% of Zambia’s mineral wealth to market.

FQM worked on 128km of the 168km road, carrying out pothole patching, shoulder repairs, reconstruction of certain sections and surfacing of some of the unsealed base courses constructed by the contractors. The work was undertaken by FQM’s in-house engineers and labour, rather than been sub-contracted, in line with the company’s wider approach to construction projects.

“Because of its intensive use of infrastructure, FQM has recognised the transport sector as an important component of the economy and a common tool used for development. A relation between the quantity and quality of transport infrastructure and the level of economic development is apparent,” said FQM Roads Division project manager Rodney Parker.

“Once you have good roads, goods and services can be transported to all parts of the province without problems, which will result in more economic activities taking place.

“Conversely, a poor transport sector is costly to the economy in terms of reduced investment coming into the country and an increase in the cost of goods and services. But if the sector is efficient it can benefit the whole of society by making all areas accessible, allowing government and the private sector to further develop those areas.”

First Quantum Mining & Operations (FQMO) is a wholly-owned subsidiary of First Quantum Minerals. The Roads and Earthworks Division was formed in 2004 to provide services to the FQM Group in Zambia. Starting small, the division has grown and at present the fleet includes 390 pieces of equipment, including 27 excavators, 80 ADTs, 36 tipper trucks, 22 graders, 25 compactors, 32 dozers, 27 water carts, and 24 TLBs. The fleet consists of machines from 1240 Bell, 172 BOMAG, 178 Caterpillar, 2300 Komatsu and 2394 Volvo. The division also has two full surfacing teams consisting of bitumen distributors, chip spreaders, compactors and brooms.

Currently the division operates at both of FQM’s Zambian operations: Kansanshi Mine in Solwezi District and Sentinel Mine in Kalumbila District.

The company has hired tippers and recycling machines for the Solwezi-to-Chingola road rehabilitation project, and recently ordered a 2395 Wirtgen WR2400 recycling machine to add to the fleet.

Projects that the division has completed include a 2,800m runway at Solwezi, another 2,800m runway at Kalumbila, the earthworks and internal roads for the Kansanshi copper smelter and the earthworks and internal roads for the new Sentinel mine process plant. They also include a 32km access road to the newly developed Sentinel mine at Kalumbila, a 15km access road to the new copper smelter and various roads around Solwezi, including the main access road to Kansanshi Mine.

For more information on companies in this article

Related Content

  • New milling and stabilisation technology is coming to market
    May 29, 2013
    An array of new developments in the market for road recycling and stabilisation machines as well as milling equipment is now on offer - Mike Woof reports. Major new developments are being seen in the sector for road recycling and stabilisation equipment, as well as milling machines. New models are coming to market that benefit from the latest low emission engine technology to meet the increasingly tough European and North American requirements.
  • Manufacturers have developed key innovations in recycling machines
    March 4, 2015
    Manufacturers are making advances in stabiliser/reclaimers and milling machines - Mike Woof reports. The market for milling equipment is a competitive one, with a range of companies from around the globe now offering machines for this segment: BOMAG, Caterpillar, Dynapac, Roadtec, Volvo CE and Wirtgen. In recent years a number of Chinese firms have entered this segment and determining the number of machines these companies manufacture is difficult, although most of their units are sold in China. But interna
  • Aggregate Industries KS12-16 ExtendaChip Spreader chips away
    November 29, 2018
    Aggregate Industries says that its new KS12-16 ExtendaChip Spreader will “redefine health and safety standards” across the highways sector. The KS12-16 ExtendaChip Spreader has been developed in conjunction with engineering firm and equipment supplier Pavemac, based in England. Aggregates Industries claims that it is “the first machine of its kind” to be extendable, with a width range between 3.6-4.9m. This removes the need for multiple chippers on site and so speeds chip spreading operations. Oth
  • Concrete surface for runway paving job
    January 18, 2016
    The Fort Lauderdale-Hollywood International Airport in Broward County, Florida, was suffering departure delays on every single flight. The existing 9R-27L runway was too short at 1615m in length, affecting capacity at the airport. To deal with the issue, the Broward County Board of County Commissioners created a plan to extend the southern runway to 2438m to accommodate larger commercial aircraft. The project was not simple however and could not be achieved by tearing out the existing runway and buil