Skip to main content

Israeli contractor using Hitachi excavator for road construction

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.
December 4, 2014 Read time: 2 mins
Israeli contractor is making use of Hitachi excavators for use in road building and quarrying

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.

The company took delivery of the large Zaxis-5 machine from the 233 Hitachi dealer in Israel, CMD, in December 2013. The machine was supplied with a 4.2m³ rock bucket and two-year/6,000-hour extended warranty to join Hilkiyahu’s expanding fleet of seven excavators.

Road 65 is a major highway that connects the Hadera (central) and Galilee (northern) regions via the shortest and easiest route. The current project is to widen the road between the Golani and new Nahal Amud interchanges. A second carriageway is being added, which will provide for two lanes in each direction, along with eight new junctions and a bridge. The earthmoving work between Masad and the Nahal Amud junction began in November 2013 and the whole project is scheduled for completion within the next two years.

The firm is working as a sub-contractor on the third section of the new road, which is 13km long. Its job is to complete all of the earthmoving, drainage, blasting and breaking of the rocks, and add the base layers to the road, before another contractor lays the asphalt. In addition the firm is operating a ZX470LCH-3 in a nearby quarry, which is supplying aggregates for the road.

For more information on companies in this article

Related Content

  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a
  • Improving road drainage in Iowa
    August 17, 2015
    In Iowa, the Simex CT 2.8 vibrating compactor wheel is playing an important role in building a subsurface, road drainage system The topsoil of Iowa is famous for its fertility, a characteristic that explains the high agricultural productivity of this state located in the American Midwest. However, the composition of the soil lends itself poorly to the dispersal of rainwater, as its fine granulometry and low level of permeability (12.7cm/hour according to the American Association of State Highway and Tran
  • Hungarian bypass contract for STRABAG
    September 14, 2021
    STRABAG has been awarded a major Hungarian bypass contract.
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.