Skip to main content

Israeli contractor using Hitachi excavator for road construction

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.
December 4, 2014 Read time: 2 mins
Israeli contractor is making use of Hitachi excavators for use in road building and quarrying

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.

The company took delivery of the large Zaxis-5 machine from the 233 Hitachi dealer in Israel, CMD, in December 2013. The machine was supplied with a 4.2m³ rock bucket and two-year/6,000-hour extended warranty to join Hilkiyahu’s expanding fleet of seven excavators.

Road 65 is a major highway that connects the Hadera (central) and Galilee (northern) regions via the shortest and easiest route. The current project is to widen the road between the Golani and new Nahal Amud interchanges. A second carriageway is being added, which will provide for two lanes in each direction, along with eight new junctions and a bridge. The earthmoving work between Masad and the Nahal Amud junction began in November 2013 and the whole project is scheduled for completion within the next two years.

The firm is working as a sub-contractor on the third section of the new road, which is 13km long. Its job is to complete all of the earthmoving, drainage, blasting and breaking of the rocks, and add the base layers to the road, before another contractor lays the asphalt. In addition the firm is operating a ZX470LCH-3 in a nearby quarry, which is supplying aggregates for the road.

For more information on companies in this article

Related Content

  • Aggregate Industries finishes Leeds project ahead of time
    January 24, 2019
    Aggregate Industries says that it finished work on a major road improvement scheme in Leeds, UK ahead of schedule thanks to meticulous planning. Located immediately off the M1 Junction 44, the A639 from Leeds Road to Pontefract Road connects the motorway slip road and a number of local distribution centres, including one for the Royal Mail. The carriageway required extensive planning and adjustments as well as replacement of ironwork and kerbs. A key requirement was that it needed to be completed quickly
  • Runway road rehabilitation
    February 29, 2012
    The Frankfurt/Hahn Airport is benefiting from an upgrade to its facilities as well as its road links that will help cope with increased traffic. The site was commissioned as a civilian airport in 1993 and is one of the fastest growing German airports as well as being the fourth largest cargo airport in Germany.
  • Volvo CE Pavers working in Montana
    June 23, 2015
    Based in Montana, contractor Century Companies is now benefiting from an updated fleet of asphalt paving machines from Volvo CE. The company has operated Volvo CE’s Blaw-Knox pavers for many years and also has two Blaw-Knox PF510s, two PF3200s and a PF410 as well as Volvo DD70, DD118 and DD25B double drum compactors. However it has now added two of the 3m class P7110 tracked machines to its fleet. These were used on a job some 16km from the North Dakota border on the periphery of the Bakken Formation. This
  • Key route widening for Pennsylvania
    August 28, 2013
    Work is now starting on the first construction phase of US Route 219 from Somerset to Meyersdale in Somerset County, Pennsylvania. The project will see the route widened to four lanes, with the work being constructed through three main contracts and taking an estimated five years to build. The project is expected to improve safety along a 17km stretch of US219. The work includes two new interchanges, one at the Mason Dixon Highway and the other at Mud Pike. The project was originally conceived in the 1970s