Skip to main content

Israeli contractor using Hitachi excavator for road construction

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.
December 4, 2014 Read time: 2 mins
Israeli contractor is making use of Hitachi excavators for use in road building and quarrying

In Israel a specialist contractor is using a new Hitachi excavator for major earthmoving work on the Road 65 construction project in the north of the country. Hilkiyahu’s ZX670LCH-5 has already clocked over 1,100 working hours, excavating and loading 1.5million m³ of materials on the upgraded route.

The company took delivery of the large Zaxis-5 machine from the 233 Hitachi dealer in Israel, CMD, in December 2013. The machine was supplied with a 4.2m³ rock bucket and two-year/6,000-hour extended warranty to join Hilkiyahu’s expanding fleet of seven excavators.

Road 65 is a major highway that connects the Hadera (central) and Galilee (northern) regions via the shortest and easiest route. The current project is to widen the road between the Golani and new Nahal Amud interchanges. A second carriageway is being added, which will provide for two lanes in each direction, along with eight new junctions and a bridge. The earthmoving work between Masad and the Nahal Amud junction began in November 2013 and the whole project is scheduled for completion within the next two years.

The firm is working as a sub-contractor on the third section of the new road, which is 13km long. Its job is to complete all of the earthmoving, drainage, blasting and breaking of the rocks, and add the base layers to the road, before another contractor lays the asphalt. In addition the firm is operating a ZX470LCH-3 in a nearby quarry, which is supplying aggregates for the road.

For more information on companies in this article

Related Content

  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2
  • Finnish highway analysis deal agreed
    November 11, 2014
    The firms Pöyry and Ramboll are to handle the design work for a project to upgrade a stretch of Highway No 6 in Finland. This package of works was awarded by the Finnish Transport Agency to Pöyry and Ramboll. The stretch of highway being upgraded lies between Taavetti and Lappeenranta. The work is for a 28km section of road including a portion of Highway No 6 and 12km of new roads. Also included will be three new interchanges, an upgrade to an existing interchange and environmental protection including the
  • JCB excavator delivering on Italian roadbuilding job
    January 3, 2013
    The JCB JS220NLC tracked excavator (pictured) is being to work on the complex construction of a 1.2km link road in Rovereto, North East Italy. Purchased by major Italian Construction group, Consta SpA and supplied by Ala-based JCB dealer OMP, the machine is working alongside a JCB JZ140 model on the project. Earthmoving project manager, Massimo Broz said: “We have many JCB models in our fleet. It is a brand that we have used for many years and we are very satisfied. Performance, efficiency and fuel consumpt
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f