Skip to main content

South Australia bridge structure inspections

The structural condition of bridges in South Australia is now being analysed following concerns over their integrity. The authorities in South Australia have hired the consulting company Aurecon to conduct a comprehensive study of 1,500 bridges located across the state. This follows after a 1.6km section of road in Adelaide had to be partly closed to traffic due to potential defects being detected in a bridge carrying trams over the road stretch. The five day closure of the road section caused major traffic
January 26, 2017 Read time: 1 min
The structural condition of bridges in South Australia is now being analysed following concerns over their integrity. The authorities in South Australia have hired the consulting company Aurecon to conduct a comprehensive study of 1,500 bridges located across the state. This follows after a 1.6km section of road in Adelaide had to be partly closed to traffic due to potential defects being detected in a bridge carrying trams over the road stretch. The five day closure of the road section caused major traffic delays in the south western area of Adelaide. There are concerns that similar structural issues in the other 1,500 bridges ranged around the state may have been overlooked due to insufficient inspection processes.

Related Content

  • Germany's bridge dilemma
    April 26, 2012
    A new report highlights concern over bridge condition on Germany’s road network. Maintenance spending will have to be boosted considerably in the 2012-2016 period for the country’s road (and rail) bridges to be brought back up to the level required. Germany will have to spend some €2.75 billion on maintenance and repair of bridges around the country to ensure that condition is optimal. The survey was carried out by Joachim Naumann for the German industry association BDI and other groups and this revealed ho
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Parsons wins UK traffic census contract
    April 11, 2014
    Consultant Parsons Brinckerhoff is now carrying out National Road Traffic Census counts across England, Scotland and Wales on behalf of the Department for Transport. This contract almost doubles the company’s previous activity in this area and it will now be managing 1,500 people to undertake over 6,000 traffic count surveys/year. The company is also introducing new le technology to this role and will be trialling a new in-house traffic survey iPad ‘app’. The firm is working closely with the Department for