Skip to main content

South Australia bridge structure inspections

The structural condition of bridges in South Australia is now being analysed following concerns over their integrity. The authorities in South Australia have hired the consulting company Aurecon to conduct a comprehensive study of 1,500 bridges located across the state. This follows after a 1.6km section of road in Adelaide had to be partly closed to traffic due to potential defects being detected in a bridge carrying trams over the road stretch. The five day closure of the road section caused major traffic
January 26, 2017 Read time: 1 min
The structural condition of bridges in South Australia is now being analysed following concerns over their integrity. The authorities in South Australia have hired the consulting company Aurecon to conduct a comprehensive study of 1,500 bridges located across the state. This follows after a 1.6km section of road in Adelaide had to be partly closed to traffic due to potential defects being detected in a bridge carrying trams over the road stretch. The five day closure of the road section caused major traffic delays in the south western area of Adelaide. There are concerns that similar structural issues in the other 1,500 bridges ranged around the state may have been overlooked due to insufficient inspection processes.

Related Content

  • Nigeria has built a major road link from concrete
    September 14, 2016
    A new concrete road is now open to traffic in Nigeria’s Kogi State. This is of note as the new 24km road is the now the country’s longest to be made from concrete. The new road was built in a joint venture partnership between Nigerian firm Dangote Construction and Brazilian company Andrade Gutierrez. The new road connects Kabba with Obajana. Part of the Dangote Group, Dangote Construction was well placed to carry out the work as it operates its Obajana Cement production facility, at Obajana. This new road
  • Gritty decisions need Smart Modelling
    April 11, 2022
    Mark Fisher, principal strategic consultant with Amey Consulting, explains how its data-led Smart Winter modelling improved a UK local government’s winter gritting efficiency by 18%.
  • Reunion road project; agreement reached
    August 13, 2020
    An agreement has been reached for the massive Reunion coastal road project.
  • RINA Consulting starts to lower Morandi Bridge sections
    February 14, 2019
    Deconstruction of the collapsed Morandi Bridge in Genoa, Italy, has begun, according to RINA Consulting. The first bridge deck section was lowered to the ground from a height of 48m, said Roberto Carpaneto, chief executive of RINA which is responsible for design control and construction management of the project. "We are really satisfied with how this delicate operation is being conducted with the whole construction team working as one to guarantee the best result.” RINA Consulting was chosen by the c