Skip to main content

South Australia bridge structure inspections

The structural condition of bridges in South Australia is now being analysed following concerns over their integrity. The authorities in South Australia have hired the consulting company Aurecon to conduct a comprehensive study of 1,500 bridges located across the state. This follows after a 1.6km section of road in Adelaide had to be partly closed to traffic due to potential defects being detected in a bridge carrying trams over the road stretch. The five day closure of the road section caused major traffic
January 26, 2017 Read time: 1 min
The structural condition of bridges in South Australia is now being analysed following concerns over their integrity. The authorities in South Australia have hired the consulting company Aurecon to conduct a comprehensive study of 1,500 bridges located across the state. This follows after a 1.6km section of road in Adelaide had to be partly closed to traffic due to potential defects being detected in a bridge carrying trams over the road stretch. The five day closure of the road section caused major traffic delays in the south western area of Adelaide. There are concerns that similar structural issues in the other 1,500 bridges ranged around the state may have been overlooked due to insufficient inspection processes.

Related Content

  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • The strangest things are found spread across motorways
    December 1, 2015
    It’s often a messy business cleaning up a motorway after a truck has shed its load, and the strangest of loads have been accidentally spread down the blacktop in the UK, according to Highways England. The most recent incident was a slippery affair for maintenance crews – 24tonnes of lard that took a day to clean up, closing the motorway for 24 hours. From toilet roll and toxic waste to wine and washing up liquid for dishes, clean-up crews sometimes must tread lightly as they go about their business. They
  • Gritty decisions need Smart Modelling
    May 27, 2022
    Mark Fisher, principal strategic consultant with Amey Consulting, explains how its data-led Smart Winter modelling improved a UK local government’s winter gritting efficiency by 18%
  • India’s new highway project
    March 24, 2017
    India’s Eastern Peripheral Expressway project is now moving forward - Partha Pratim Basistha reports. Work on the 12- year pending, National, Eastern Peripheral Expressway-2, surrounding India’s National Capital, Delhi and its National Capital Region (NCR) has finally commenced. The project involves the North Indian states of Haryana and Uttar Pradesh and this development follows the approval of India’s Supreme Court. The project was held up due to land acquisition issues. Contractors are now in the process