Skip to main content

Efficient bridge demolition in China

A contractor in China has completed an effective bridge demolition job efficiently and quickly. The pre-weakened structure was brought crashing into the river it spanned following one final push using the boom of an excavator. The defunct bridge collapsed in a controlled fashion without injury or inconvenience, allowing the rubble to be removed in a subsequent operation.
March 31, 2014 Read time: 1 min
A contractor in China has completed an effective bridge demolition job efficiently and quickly. The pre-weakened structure was brought crashing into the river it spanned following one final push using the boom of an excavator. The defunct bridge collapsed in a controlled fashion without injury or inconvenience, allowing the rubble to be removed in a subsequent operation.

Related Content

  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • Tennessee highway bridge explosive demolition VIDEO
    September 23, 2014
    Explosive demolition has been used to remove a Tennessee bridge that no longer met requirements. The bridge was on Tennessee Interstate 65 near Franklin in Williamson County and has been removed by a specialist contractor. The highway authorities decided to demolish the bridge following a crash involving a tanker truck in August of this year. The structure was pre-drilled with explosive charges and then demolished remotely, with the explosive demolition being carried out successfully and without any injurie
  • Efficient highway bridge demolition with breakers
    July 16, 2013
    As this video clip shows, efficient bridge demolition work has a lot to do with effective planning. Bringing down this defunct bridge over a busy highway called for careful planning so as to minimise traffic disruption. Proper preparation allowed engineers to make the site ready for a closure of the highway, with the bridge then being brought down within a tight timeframe. Having sufficient excavators fitted with hydraulic breakers was a key component in ensuring that the work could be carried out in time,