Skip to main content

Sandvik roadheaders working on highway project in Australia

Much of the excavation work for the North Connex highway tunnel project in Sydney, Australia will be carried out by roadheaders from Sandvik. In all, six MT720s, one MT620 and six MT520 machines will work on the project, in addition to six road headers from other suppliers. The work is being carried out by the Lend Lease–Bouygues Joint Venture (LLB JV) and is constructing a strategically important highway. The project is being sponsored by the NSW Government, Transurban and the M7 Westlink Shareholders.
November 20, 2015 Read time: 2 mins
Sandvik roadheaders will carry out much of the excavation work for Sydney’s 9km long North Connex, twin tube tunnel
Much of the excavation work for the North Connex highway tunnel project in Sydney, Australia will be carried out by roadheaders from 325 Sandvik. In all, six MT720s, one MT620 and six MT520 machines will work on the project, in addition to six road headers from other suppliers.

The work is being carried out by the Lend Lease–Bouygues Joint Venture (LLB JV) and is constructing a strategically important highway. The project is being sponsored by the NSW Government, Transurban and the M7 Westlink Shareholders. This tolled highway will connect the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills – called North Connex. When complete, it will link Sydney's north to the Orbital network, and form part of the National Highway route. The scheme includes twin tunnels about 9km in length, with two lanes and a breakdown lane in each direction, as well as an increased height clearance of 5.3m with a speed limit of 80km/h. Each tunnel will be built with long-term capacity for three lanes, but will initially operate with two lanes and a breakdown lane in each direction.

The use of roadheaders was selected as the most suitable excavation method for North Connex. This was due to the large number of different tunnel profiles for intersections, ramps and shafts included in the project. Using a roadheader would allow the precise excavation profile required.  The roadheaders chosen for the project are powered electro-hydraulically and are equipped with an advanced profile control, an automatic sequence control system and online data processing possibilities.

For more information on companies in this article

Related Content

  • UK report suggests 30km Pennine tunnel with robotic maintenance
    December 2, 2015
    The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
  • Texas highway upgrade commencing
    May 11, 2021
    A new Texas highway upgrade project is commencing.
  • Rotenberg’s Mostotrest to fight for $5 billion Russia’s road-building contract
    December 2, 2013
    Interest is strong in one of Russia’s premier projects for road infrastructure - Eugene Gerden reports The State Company Russian Highways (Avtodor) has officially announced a tender for the construction of the sixth - and longest - section of the Moscow - St Petersburg highway. Avtodor is Russia’s leading company in the field of development of national road infrastructure, while this is one of the largest and most controversial projects in Russian road building in recent years. The 6th section of the
  • New bridges, ramp and tunnel for Dubai
    February 19, 2020
    New flyover bridges, a ramp and a tunnel connection are being built in Dubai.