Skip to main content

Sandvik roadheaders working on highway project in Australia

Much of the excavation work for the North Connex highway tunnel project in Sydney, Australia will be carried out by roadheaders from Sandvik. In all, six MT720s, one MT620 and six MT520 machines will work on the project, in addition to six road headers from other suppliers. The work is being carried out by the Lend Lease–Bouygues Joint Venture (LLB JV) and is constructing a strategically important highway. The project is being sponsored by the NSW Government, Transurban and the M7 Westlink Shareholders.
November 20, 2015 Read time: 2 mins
Sandvik roadheaders will carry out much of the excavation work for Sydney’s 9km long North Connex, twin tube tunnel
Much of the excavation work for the North Connex highway tunnel project in Sydney, Australia will be carried out by roadheaders from 325 Sandvik. In all, six MT720s, one MT620 and six MT520 machines will work on the project, in addition to six road headers from other suppliers.

The work is being carried out by the Lend Lease–Bouygues Joint Venture (LLB JV) and is constructing a strategically important highway. The project is being sponsored by the NSW Government, Transurban and the M7 Westlink Shareholders. This tolled highway will connect the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills – called North Connex. When complete, it will link Sydney's north to the Orbital network, and form part of the National Highway route. The scheme includes twin tunnels about 9km in length, with two lanes and a breakdown lane in each direction, as well as an increased height clearance of 5.3m with a speed limit of 80km/h. Each tunnel will be built with long-term capacity for three lanes, but will initially operate with two lanes and a breakdown lane in each direction.

The use of roadheaders was selected as the most suitable excavation method for North Connex. This was due to the large number of different tunnel profiles for intersections, ramps and shafts included in the project. Using a roadheader would allow the precise excavation profile required.  The roadheaders chosen for the project are powered electro-hydraulically and are equipped with an advanced profile control, an automatic sequence control system and online data processing possibilities.

For more information on companies in this article

Related Content

  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Ivory Coast tunnel project
    March 30, 2022
    BESIX is working on an Ivory Coast tunnel project.
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Sydney buses to collect road data
    July 22, 2022
    In the Australian scheme called Asset AI, 32 public buses in Sydney have a camera and sensor.