Skip to main content

UK’s Humber Bridge Board to deploy automatic tolling system

The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will co
May 13, 2014 Read time: 1 min
The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will continue accepting manual payments. One staffed booth will also continue to operate.

Related Content

  • Residents near Mersey Gateway Bridge to get up to 300 free journeys a year
    December 12, 2013
    Halton Borough Council has revealed that all eligible residents within the North West England borough will receive up to 300 free journeys per year when the new Mersey Gateway Bridge between Runcorn and Widnes and the current Silver Jubilee Bridge become tolled in 2017. The scheme, expected to revitalise an area hit hard by the ongoing tough European economic climate, was approved at a full Halton Borough Council meeting last night (11 December 2013).
  • Long life asphalt paving reduces maintenance
    April 11, 2012
    Contractor FM Conway is working on a three year contract with Dover Harbour Board to reconstruct and resurface busy access routes and large vehicle parks within the port. One of the major factors for this contract being awarded was the company's strong green credentials. The contract is based around small and large individual paving projects within the Eastern Docks, which can range in time scales from three weeks to six months. The first phase of work, which started in early May, was to fully reconstruct
  • Long life asphalt paving reduces maintenance
    May 8, 2012
    Contractor FM Conway is working on a three year contract with Dover Harbour Board to reconstruct and resurface busy access routes and large vehicle parks within the port. One of the major factors for this contract being awarded was the company's strong green credentials. The contract is based around small and large individual paving projects within the Eastern Docks, which can range in time scales from three weeks to six months. The first phase of work, which started in early May, was to fully reconstruct
  • Minister gives green light for UK road schemes
    May 8, 2012
    Roads Minister Mike Penning yesterday gave the green light for development work to be carried out on six new major UK road schemes. The development work, which will take place over the next three years, aims to prime the road schemes for completion in the early years of the next spending review period (post 2015). The six proposed road schemes, which aim to boost economic growth as part of the Government’s National Infrastructure Plan, are: