Skip to main content

UK’s Humber Bridge Board to deploy automatic tolling system

The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will co
May 13, 2014 Read time: 1 min
The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will continue accepting manual payments. One staffed booth will also continue to operate.

Related Content

  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • Automatic control
    February 7, 2012
    Leica Geosystems says that sophisticated PowerDigger 2D guidance system for excavators offers automatic slope control. The system expands on its PowerSnap technology and is said to make excavating easier and more productive. The system uses a standard panel whether fitted to a dozer, excavator or grader, which is also said to save money on training and equipment, as well as reducing down time. Leica PowerDigger 2D system allows multiple elevations and slopes to be constructed at any orientation, witho
  • Eliminating leaks on Prague bridge
    July 17, 2012
    Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague. Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair
  • Eliminating leaks on Prague bridge
    July 17, 2012
    Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague. Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair