Skip to main content

UK’s Humber Bridge Board to deploy automatic tolling system

The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will co
May 13, 2014 Read time: 1 min
The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will continue accepting manual payments. One staffed booth will also continue to operate.

Related Content

  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi
  • Hydrodemolition equipment helps Swiss bridge rebuild
    December 2, 2014
    A highway bridge in Switzerland has been refurbished with help from hydrodemolition equipment supplied by Aquajet The firm’s latest Rotolance 2500 was used alongside an Aquacutter 710 VE evolution on the Viaduc de Chillon link, above Lake Geneva. The machines were used by Zurich-based hydrodemolition specialist contractor, Walo Hydrodynamik, to remove more than 25,000m³ of concrete deck on the bridge.
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • BarrierGuard 800 keeps key U.S. bridge open
    April 11, 2013
    BarrierGuard 800 from Highway Care is said to be preventing the closure of a vital highway bridge in the United States. As a critical part of the US national infrastructure, the Sarah Mildred Long Bridge services the Portsmouth Naval Shipyard. The link allows the transporting of spent nuclear fuel and heavy freight bound to and from the naval shipyard, with an average of 15,000 vehicles per day crossing this structurally deficient bridge. The railing along the Sarah Mildred Long Bridge had begun to deterio